# Planned developments in Sheboygan Falls, WI

Boardwalk found 37 planned projects in Sheboygan Falls, WI in public filings from the last 12 months. The latest is on the Sheboygan Falls Committee of the Whole agenda for Oct 7, 2026.

Data as of Oct 11, 2026. Updated monthly. Page: https://boardwalkai.com/development/wisconsin/sheboygan-falls/

## Sheboygan Falls at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 37 |
| New in the last 30 days | 2 |
| Most common type | Infrastructure |
| Latest filing | Oct 7, 2026, Sheboygan Falls Committee of the Whole |
| Sources we check | 3 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Sheboygan Falls

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Infrastructure | 13 | 35% |
| Public and institutional | 9 | 24% |
| Residential | 5 | 14% |
| Commercial | 5 | 14% |
| Development decisions | 5 | 14% |

## Recent projects in Sheboygan Falls

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| Monroe Street Lead Line and Sewer Lateral Replacement Project | Not stated | Sewer and wastewater | Not stated in filing | Early planning | Sep 16, 2026 |
| Brown Pedestrian Bridge Replacement | Not stated | Bridges | Not stated in filing | Early planning | Jul 8, 2026 |
| Residential Apartment Development | Premier Sheboygan Falls, LLC | Multifamily | Not stated in filing | Approved | Jul 1, 2026 |
| $69K 2026 Street and Utility Improvements Engineering Services | Not stated | Roads and highways | Not stated in filing | Approved | May 6, 2026 |
| Recreational Trails Program Grant Application | Not stated | Trails and greenways | Not stated in filing | Early planning | Feb 18, 2026 |
| Jaycee's Riverwalk Planning Services | Not stated | Transportation | Not stated in filing | In design | Feb 18, 2026 |
| Jaycee's Riverwalk Recreational Trail Grant Application | Not stated | Trails and greenways | Not stated in filing | Approved | Feb 18, 2026 |
| State Highway 32 Multi-Use Path Design and Engineering Contract | Not stated | Trails and greenways | Not stated in filing | In design | Feb 18, 2026 |
| Multi-use Path Design and Engineering Contract | Not stated | Trails and greenways | Not stated in filing | In design | Jan 21, 2026 |
| 5th Street Wet Detention Basin Infrastructure | Not stated | Stormwater and drainage | Not stated in filing | In design | Dec 17, 2025 |
| $83K Westside Recreation Area Design and Engineering Plan | Jos. Schmitt Construction | Parks | Not stated in filing | Approved | Dec 3, 2025 |
| Pedestrian and Bicycle Multi-Use Path Grant Application | Not stated | Trails and greenways | Not stated in filing | Approved | Oct 15, 2025 |

Showing 12 of 37 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- Kohler, WI · 43 projects
- [Sheboygan, WI](https://boardwalkai.com/development/wisconsin/sheboygan-city/) · 54 projects
- Howards Grove, WI · 3 projects
- [Oostburg, WI](https://boardwalkai.com/development/wisconsin/oostburg/) · 27 projects
- Waldo, WI · 11 projects
- [Plymouth, WI](https://boardwalkai.com/development/wisconsin/plymouth/) · 74 projects

All places in Wisconsin: [Wisconsin](https://boardwalkai.com/development/wisconsin/)

## Questions about Sheboygan Falls

### What's planned in Sheboygan Falls, WI?

Boardwalk found 37 planned projects in Sheboygan Falls, WI in the last 12 months. The latest is on the Sheboygan Falls Committee of the Whole agenda for Oct 7, 2026.

### Where does this data come from?

Boardwalk's Sheboygan Falls projects come from public meeting records, such as Sheboygan Falls Committee of the Whole agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Sheboygan Falls's public records at least once a week; the last check was Oct 10, 2026. These counts are as of Oct 11, 2026 and refresh monthly.

### Can I get an Alert for new Sheboygan Falls projects?

Yes, a Boardwalk Alert emails you new Sheboygan Falls projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [sheboygan-falls.json](https://boardwalkai.com/data/places/wisconsin/sheboygan-falls.json) · [sheboygan-falls.md](https://boardwalkai.com/development/wisconsin/sheboygan-falls/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Sheboygan Falls, WI", boardwalkai.com/development/wisconsin/sheboygan-falls/, data as of Oct 11, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
