# Planned developments in Bangor Base, WA

Boardwalk found 24 planned projects in Bangor Base, WA in public filings from the last 12 months. The latest is on the NAVFAC Northwest agenda for Oct 11, 2026.

Data as of Oct 19, 2026. Updated monthly. Page: https://boardwalkai.com/development/washington/bangor-base/

## Bangor Base at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 24 |
| New in the last 30 days | 13 |
| Most common type | Infrastructure |
| Latest filing | Oct 11, 2026, NAVFAC Northwest |
| Sources we check | 1 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Bangor Base

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Infrastructure | 11 | 46% |
| Public and institutional | 9 | 38% |
| Industrial | 4 | 17% |

## Recent projects in Bangor Base

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| $5M-$15M Temporary Parking Lot at NBK Bangor for Trident Refit | Not stated | Parking lots | Not stated in filing | Early planning | Oct 11, 2026 |
| $50M-$100M COLUMBIA Submarine Training Facility Expansion | Not stated | Government buildings | Not stated in filing | Early planning | Oct 11, 2026 |
| $10M-$25M Ammunition Wharf Structural Repairs | WF MACC | Transportation | Not stated in filing | In design | Oct 11, 2026 |
| $10M-$25M B844 Building Renovation for PSNS Security | Not stated | Government buildings | Not stated in filing | Early planning | Oct 11, 2026 |
| $25M-$100M GDS Enhanced Integrated Air and Missile Defense Phase 3 at US NAVBASEGUAM | Not stated | Government buildings | Not stated in filing | In design | Sep 30, 2026 |
| $500M Waterfront Production Facility at Dry Dock 5 | Not stated | Manufacturing | Not stated in filing | Early planning | Sep 30, 2026 |
| $25M-$100M PDI Foward Operating Site | Not stated | Government buildings | Not stated in filing | Early planning | Sep 30, 2026 |
| $100M-$250M Polaris Point Electrical Capacity Upgrade | US NAVBASEGUAM | Utilities | Not stated in filing | Early planning | Sep 30, 2026 |
| $250M Earth Covered Magazines at US Navbase Guam | US NAVBASE GUAM | Industrial | Not stated in filing | Early planning | Mar 31, 2026 |
| Apra Harbor Waterfront Repairs and Breakwater Infrastructure | Not stated | Infrastructure | Not stated in filing | In design | Mar 6, 2026 |
| 35-Magazine Ordnance Storage Complex on 50 Acres | U.S. Army | Industrial | 50 acres | Early planning | Mar 6, 2026 |
| P-320 Recycling Center with Waste Transfer and Admin Buildings | Not stated | Industrial | Not stated in filing | Early planning | Dec 12, 2025 |

Showing 12 of 24 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- [Poulsbo, WA](https://boardwalkai.com/development/washington/poulsbo/) · 61 projects
- Rocky Point, WA · 14 projects
- Kitsap Lake, WA · 7 projects
- Enetai, WA · 7 projects
- [Bainbridge Island, WA](https://boardwalkai.com/development/washington/bainbridge-island/) · 39 projects
- [Bremerton, WA](https://boardwalkai.com/development/washington/bremerton/) · 180+ projects

All places in Washington: [Washington](https://boardwalkai.com/development/washington/)

## Questions about Bangor Base

### What's planned in Bangor Base, WA?

Boardwalk found 24 planned projects in Bangor Base, WA in the last 12 months. The latest is on the NAVFAC Northwest agenda for Oct 11, 2026.

### Where does this data come from?

Boardwalk's Bangor Base projects come from public meeting records, such as NAVFAC Northwest agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Bangor Base's public records at least once a week; the last check was Oct 20, 2026. These counts are as of Oct 19, 2026 and refresh monthly.

### Can I get an Alert for new Bangor Base projects?

Yes, a Boardwalk Alert emails you new Bangor Base projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [bangor-base.json](https://boardwalkai.com/data/places/washington/bangor-base.json) · [bangor-base.md](https://boardwalkai.com/development/washington/bangor-base/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Bangor Base, WA", boardwalkai.com/development/washington/bangor-base/, data as of Oct 19, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
