# Planned developments in Wolcott, VT

Boardwalk found 31 planned projects in Wolcott, VT in public filings from the last 12 months, mostly infrastructure. The latest is on the Wolcott Selectboard agenda for Sep 16, 2026.

Data as of Oct 11, 2026. Updated monthly. Page: https://boardwalkai.com/development/vermont/wolcott/

## Wolcott at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 31 |
| New in the last 30 days | 2 |
| Most common type | Infrastructure |
| Latest filing | Sep 16, 2026, Wolcott Selectboard |
| Sources we check | 3 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Wolcott

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Infrastructure | 16 | 52% |
| Development decisions | 7 | 23% |
| Commercial | 3 | 10% |
| Residential | 3 | 10% |
| Public and institutional | 2 | 6% |

## Recent projects in Wolcott

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| Wolcott Community Forest Mitigation | Green Mountain Habitat for Humanity | Residential | Not stated in filing | Seeking approval | Sep 16, 2026 |
| $7,500 Flat Iron Road Abutment Removal Design Grant Match | Not stated | Transportation | Not stated in filing | In design | Jul 15, 2026 |
| North Wolcott Rd Stream Restoration Design Contract | Town and Country Sheds | Utilities | Not stated in filing | Approved | Jul 15, 2026 |
| East Hill Road Culvert Replacement | Not stated | Stormwater and drainage | Not stated in filing | Out to bid | Jul 1, 2026 |
| Wolcott Village Wastewater System Construction | Town of Wolcott, VT | Sewer and wastewater | Not stated in filing | Out to bid | Jun 10, 2026 |
| $13K North Wolcott Bridge Scoping and Design Study | Not stated | Bridges | Not stated in filing | Approved | Jun 3, 2026 |
| $1.7M Flat Iron Road Flood Mitigation Project | Not stated | Utilities | Not stated in filing | Early planning | Apr 15, 2026 |
| $169K Flood Mitigation and Bridge Upgrading Grant Application | Not stated | Bridges | Not stated in filing | Approved | Apr 1, 2026 |
| Wastewater Project Final Design | Not stated | Sewer and wastewater | Not stated in filing | Approved | Oct 15, 2025 |

Showing 9 of 31 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- [Hardwick, VT](https://boardwalkai.com/development/vermont/hardwick/) · 70 projects
- [Morrisville, VT](https://boardwalkai.com/development/vermont/morrisville/) · 49 projects
- [Hyde Park, VT](https://boardwalkai.com/development/vermont/hyde-park/) · 30 projects
- Greensboro, VT · 9 projects
- [Johnson, VT](https://boardwalkai.com/development/vermont/johnson/) · 66 projects
- [Cabot, VT](https://boardwalkai.com/development/vermont/cabot/) · 26 projects

All places in Vermont: [Vermont](https://boardwalkai.com/development/vermont/)

## Questions about Wolcott

### What's planned in Wolcott, VT?

Boardwalk found 31 planned projects in Wolcott, VT in the last 12 months, mostly infrastructure. The latest is on the Wolcott Selectboard agenda for Sep 16, 2026.

### Where does this data come from?

Boardwalk's Wolcott projects come from public meeting records, such as Wolcott Selectboard agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Wolcott's public records at least once a week; the last check was Oct 10, 2026. These counts are as of Oct 11, 2026 and refresh monthly.

### Can I get an Alert for new Wolcott projects?

Yes, a Boardwalk Alert emails you new Wolcott projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [wolcott.json](https://boardwalkai.com/data/places/vermont/wolcott.json) · [wolcott.md](https://boardwalkai.com/development/vermont/wolcott/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Wolcott, VT", boardwalkai.com/development/vermont/wolcott/, data as of Oct 11, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
