# Planned developments in Springfield, VT

Boardwalk found 20 planned projects in Springfield, VT in public filings from the last 12 months, mostly infrastructure. The latest is on the Town of Springfield Selectboard agenda for Sep 14, 2026.

Data as of Oct 19, 2026. Updated monthly. Page: https://boardwalkai.com/development/vermont/springfield/

## Springfield at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 20 |
| New in the last 30 days | 0 |
| Most common type | Infrastructure |
| Latest filing | Sep 14, 2026, Town of Springfield Selectboard |
| Sources we check | 6 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Springfield

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Infrastructure | 17 | 85% |
| Development decisions | 1 | 5% |
| Public and institutional | 1 | 5% |
| Residential | 1 | 5% |

## Recent projects in Springfield

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| Subsurface Stormwater Infiltration Basin at Commons Park | Not stated | Stormwater and drainage | Not stated in filing | In design | Sep 14, 2026 |
| Solar Array Project | Norwich Technologies | Solar farms | Not stated in filing | Early planning | Aug 10, 2026 |
| Lead Service Line Program Engineering Services Agreement | Not stated | Pipelines | Not stated in filing | In design | Aug 10, 2026 |
| $125K Wall Street Retaining Wall Repair | Not stated | Roads and highways | Not stated in filing | Approved | Jul 20, 2026 |
| Toonerville Trail Bridge Replacement and Trail Relocation | Not stated | Bridges | Not stated in filing | In design | Jul 20, 2026 |
| $4.2M Clinton St Water Line Replacement | Not stated | Pipelines | Not stated in filing | Approved | Mar 4, 2026 |
| $286.9K Main Street and River Street Water Line Replacement | Not stated | Pipelines | Not stated in filing | Approved | Feb 9, 2026 |
| $129,100 Main Street Sewer Project Planning Loan | Vermont State Revolving Loan Fund | Sewer and wastewater | Not stated in filing | Approved | Feb 9, 2026 |
| $6M Wastewater Treatment Facility Rehab | Not stated | Sewer and wastewater | Not stated in filing | Approved | Nov 24, 2025 |
| $30K Cutler Drive Wastewater Line Replacement | Not stated | Sewer and wastewater | Not stated in filing | Approved | Oct 27, 2025 |

Showing 10 of 20 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- [Chester, VT](https://boardwalkai.com/development/vermont/chester/) · 130+ projects
- Cavendish, VT · Checked, no projects in 12 months
- Grafton, VT · 21 projects
- Saxtons River, VT · Checked, no projects in 12 months
- Bellows Falls, VT · Checked, no projects in 12 months
- [Ludlow, VT](https://boardwalkai.com/development/vermont/ludlow/) · 38 projects

All places in Vermont: [Vermont](https://boardwalkai.com/development/vermont/)

## Questions about Springfield

### What's planned in Springfield, VT?

Boardwalk found 20 planned projects in Springfield, VT in the last 12 months, mostly infrastructure. The latest is on the Town of Springfield Selectboard agenda for Sep 14, 2026.

### Where does this data come from?

Boardwalk's Springfield projects come from public meeting records, such as Town of Springfield Selectboard agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Springfield's public records at least once a week; the last check was Oct 19, 2026. These counts are as of Oct 19, 2026 and refresh monthly.

### Can I get an Alert for new Springfield projects?

Yes, a Boardwalk Alert emails you new Springfield projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [springfield.json](https://boardwalkai.com/data/places/vermont/springfield.json) · [springfield.md](https://boardwalkai.com/development/vermont/springfield/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Springfield, VT", boardwalkai.com/development/vermont/springfield/, data as of Oct 19, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
