# Planned developments in Price, UT

Boardwalk found 36 planned projects in Price, UT in public filings from the last 12 months, mostly infrastructure. The latest is on the Price Municipal Corporation agenda for Sep 16, 2026.

Data as of Oct 11, 2026. Updated monthly. Page: https://boardwalkai.com/development/utah/price/

## Price at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 36 |
| New in the last 30 days | 2 |
| Most common type | Infrastructure |
| Latest filing | Sep 16, 2026, Price Municipal Corporation |
| Sources we check | 27 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Price

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Infrastructure | 19 | 53% |
| Commercial | 6 | 17% |
| Public and institutional | 4 | 11% |
| Development decisions | 3 | 8% |
| Residential | 3 | 8% |
| Industrial | 1 | 3% |

## Recent projects in Price

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| 1.78-Acre Stormwater Detention Basin at 1020 Covecrest Street | Michleigh Enterprises | Stormwater and drainage | 1.78 acres | Early planning | Sep 9, 2026 |
| $48,528 Meads Wash Detention Basin Storm Drain Design Amendment | Not stated | Stormwater and drainage | Not stated in filing | In design | Jun 10, 2026 |
| Engineering Services Agreement for Meads Wash Detention Basin | Not stated | Stormwater and drainage | Not stated in filing | In design | May 27, 2026 |
| Meads Wash Detention/Debris Basin Funding Request | Not stated | Stormwater and drainage | Not stated in filing | Early planning | Mar 11, 2026 |
| Engineering Services for EWP Project Flood Mitigation Infrastructure | Not stated | Utilities | Not stated in filing | Approved | Mar 11, 2026 |
| Flood Mitigation Improvements for Emergency Watershed Protection Project 2025 | Not stated | Utilities | Not stated in filing | Approved | Mar 11, 2026 |
| $1.5M Water Treatment Plant Improvements | Not stated | Utilities | Not stated in filing | Early planning | Mar 5, 2026 |
| Storm Water Mitigation Design and Construction for Price Municipal Corporation | Not stated | Stormwater and drainage | Not stated in filing | Out to bid | Feb 25, 2026 |
| Federal Aid Funding Application for Price Canal Box Culvert Replacement | Not stated | Stormwater and drainage | Not stated in filing | Approved | Feb 11, 2026 |
| Water Asset Management Plan for Spring Water Transmission Line Replacement | Not stated | Power plants | Not stated in filing | In design | Feb 11, 2026 |
| 5,000 Acre-Foot Reservoir Project | Not stated | Water tanks and reservoirs | Not stated in filing | Early planning | Dec 10, 2025 |
| 7-Mile Water Transmission Line Replacement | Not stated | Power plants | Not stated in filing | Early planning | Apr 9, 2025 |

Showing 12 of 36 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- Wellington, UT · 14 projects
- Helper, UT · 14 projects
- Cleveland, UT · 15 projects
- Scofield, UT · 8 projects
- Huntington, UT · 17 projects
- East Carbon, UT · 9 projects

All places in Utah: [Utah](https://boardwalkai.com/development/utah/)

## Questions about Price

### What's planned in Price, UT?

Boardwalk found 36 planned projects in Price, UT in the last 12 months, mostly infrastructure. The latest is on the Price Municipal Corporation agenda for Sep 16, 2026.

### Where does this data come from?

Boardwalk's Price projects come from public meeting records, such as Price Municipal Corporation agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Price's public records at least once a week; the last check was Oct 11, 2026. These counts are as of Oct 11, 2026 and refresh monthly.

### Can I get an Alert for new Price projects?

Yes, a Boardwalk Alert emails you new Price projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [price.json](https://boardwalkai.com/data/places/utah/price.json) · [price.md](https://boardwalkai.com/development/utah/price/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Price, UT", boardwalkai.com/development/utah/price/, data as of Oct 11, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
