# Planned developments in Waller, TX

Boardwalk found 41 planned projects in Waller, TX in public filings from the last 12 months. The latest is on the City of Waller City Council agenda for Sep 21, 2026.

Data as of Oct 11, 2026. Updated monthly. Page: https://boardwalkai.com/development/texas/waller-city/

## Waller at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 41 |
| New in the last 30 days | 5 |
| Most common type | Infrastructure |
| Latest filing | Sep 21, 2026, City of Waller City Council |
| Sources we check | 2 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## Looking for Waller County?

[Waller County, TX](https://boardwalkai.com/development/texas/waller/) · 270+ projects

## What's planned in Waller

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Infrastructure | 18 | 44% |
| Development decisions | 15 | 37% |
| Commercial | 6 | 15% |
| Public and institutional | 2 | 5% |

## Recent projects in Waller

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| Blinn College Atmos Regulator Station Construction Bidding | Not stated | Utilities | Not stated in filing | Out to bid | Sep 21, 2026 |
| Wastewater Treatment Plant and Trunk Routing Study | Bleyl Engineering | Sewer and wastewater | Not stated in filing | In design | Sep 21, 2026 |
| Blinn College Utility Extension Project | IDS Engineering Group | Utilities | Not stated in filing | Out to bid | Sep 8, 2026 |
| Wastewater Master Plan and Treatment Plant Improvements | Not stated | Sewer and wastewater | Not stated in filing | In design | May 18, 2026 |
| $50K Natural Gas Line Design Contract for Blinn College | Blinn College | Pipelines | Not stated in filing | Approved | Feb 18, 2026 |
| $129K Blinn College Utility Extension | Blinn College | Utilities | Not stated in filing | Approved | Feb 18, 2026 |
| Well #6 Water Drilling Project | Not stated | Utilities | Not stated in filing | Approved | Feb 18, 2026 |
| $129K Water and Sanitary Sewer Extension | Not stated | Utilities | Not stated in filing | In design | Feb 18, 2026 |
| Blinn College District Final Plat | Blinn College District | Schools | Not stated in filing | Seeking approval | Feb 18, 2026 |
| $5.4M Sanitary Sewer Collection Improvements | Not stated | Sewer and wastewater | Not stated in filing | Early planning | Oct 20, 2025 |
| Water Plant No. 6 Design Contract | IDS Engineering Group | Utilities | Not stated in filing | In design | Sep 15, 2025 |
| Old Houston Highway Reconstruction Design Contract | IDS Engineering Group | Roads and highways | Not stated in filing | Approved | Sep 15, 2025 |

Showing 12 of 41 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- [Prairie View, TX](https://boardwalkai.com/development/texas/prairie-view/) · 29 projects
- Pine Island, TX · 8 projects
- [Hempstead, TX](https://boardwalkai.com/development/texas/hempstead/) · 25 projects
- Stagecoach, TX · 23 projects
- [Magnolia, TX](https://boardwalkai.com/development/texas/magnolia/) · 53 projects
- Todd Mission, TX · Checked, no projects in 12 months

All places in Texas: [Texas](https://boardwalkai.com/development/texas/)

## Questions about Waller

### What's planned in Waller, TX?

Boardwalk found 41 planned projects in Waller, TX in the last 12 months. The latest is on the City of Waller City Council agenda for Sep 21, 2026.

### Where does this data come from?

Boardwalk's Waller projects come from public meeting records, such as City of Waller City Council agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Waller's public records at least once a week; the last check was Oct 11, 2026. These counts are as of Oct 11, 2026 and refresh monthly.

### Can I get an Alert for new Waller projects?

Yes, a Boardwalk Alert emails you new Waller projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [waller-city.json](https://boardwalkai.com/data/places/texas/waller-city.json) · [waller-city.md](https://boardwalkai.com/development/texas/waller-city/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Waller, TX", boardwalkai.com/development/texas/waller-city/, data as of Oct 11, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
