# Planned developments in Schertz, TX

Boardwalk found 91 planned projects in Schertz, TX in public filings from the last 12 months, mostly infrastructure. The latest is on the Schertz Transportation Safety Advisory Commission agenda for Oct 1, 2026.

Data as of Oct 11, 2026. Updated monthly. Page: https://boardwalkai.com/development/texas/schertz/

## Schertz at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 91 |
| New in the last 30 days | 2 |
| Most common type | Infrastructure |
| Latest filing | Oct 1, 2026, Schertz Transportation Safety Advisory Commission |
| Sources we check | 22 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Schertz

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Infrastructure | 51 | 56% |
| Residential | 9 | 10% |
| Public and institutional | 9 | 10% |
| Industrial | 8 | 9% |
| Development decisions | 7 | 8% |
| Commercial | 5 | 5% |
| Mixed use | 2 | 2% |

## Recent projects in Schertz

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| $1.78M 2026 SPAM Resurfacing Project | Not stated | Roads and highways | Not stated in filing | In design | Mar 17, 2026 |
| $1.6M West Dietz Creek Trail Project | Not stated | Trails and greenways | Not stated in filing | Early planning | Mar 17, 2026 |
| $1.46M Savannah Drive Resurfacing | Not stated | Roads and highways | Not stated in filing | In design | Mar 3, 2026 |
| 7.8-Acre Convenience Store and Gas Station | Schertz Stop LLC | Gas stations and convenience stores | 7.74 acres | Seeking approval | Feb 4, 2026 |
| $10.4M Northcliffe Country Club Estates Utility Infrastructure Replacement | Not stated | Pipelines | Not stated in filing | In design | Oct 14, 2025 |
| $49K Lift Station Decommissioning Project | Utility Engineering Group | Sewer lift stations | Not stated in filing | In design | Sep 2, 2025 |
| $4.88M FM 3009 Water Transmission Main Replacement | Not stated | Pipelines | Not stated in filing | In design | Sep 2, 2025 |
| $13.75M IH 35 Ground Storage Tank and Pump Station | Not stated | Utilities | Not stated in filing | Approved | Sep 2, 2025 |
| $74K Friesenhahn Lift Station Drainage Improvements | Utility Engineering Group | Sewer lift stations | Not stated in filing | In design | Sep 2, 2025 |
| $5.35M Schertz Forest Street and Water Line Replacement | Not stated | Roads and highways | Not stated in filing | In design | Aug 5, 2025 |
| $4.4M Water Loop Lines Infrastructure Project | Not stated | Pipelines | Not stated in filing | In design | Aug 5, 2025 |
| $16.2M Cibolo West Wastewater Trunk Main | Not stated | Sewer and wastewater | Not stated in filing | In design | Aug 5, 2025 |

Showing 12 of 91 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- Universal City, TX · 19 projects
- [Cibolo, TX](https://boardwalkai.com/development/texas/cibolo/) · 37 projects
- Selma, TX · 13 projects
- Live Oak, TX · 9 projects
- Converse, TX · 8 projects
- Garden Ridge, TX · 9 projects

All places in Texas: [Texas](https://boardwalkai.com/development/texas/)

## Questions about Schertz

### What's planned in Schertz, TX?

Boardwalk found 91 planned projects in Schertz, TX in the last 12 months, mostly infrastructure. The latest is on the Schertz Transportation Safety Advisory Commission agenda for Oct 1, 2026.

### Where does this data come from?

Boardwalk's Schertz projects come from public meeting records, such as Schertz Transportation Safety Advisory Commission agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Schertz's public records at least once a week; the last check was Oct 10, 2026. These counts are as of Oct 11, 2026 and refresh monthly.

### Can I get an Alert for new Schertz projects?

Yes, a Boardwalk Alert emails you new Schertz projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [schertz.json](https://boardwalkai.com/data/places/texas/schertz.json) · [schertz.md](https://boardwalkai.com/development/texas/schertz/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Schertz, TX", boardwalkai.com/development/texas/schertz/, data as of Oct 11, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
