# Planned developments in Grimes County, TX

Boardwalk found 45 planned projects in Grimes County, TX in public filings from the last 12 months, mostly infrastructure. The latest is on the City of Iola agenda for Aug 21, 2026.

Data as of Oct 19, 2026. Updated monthly. Page: https://boardwalkai.com/development/texas/grimes/

## Grimes County at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 45 |
| New in the last 30 days | 0 |
| Most common type | Infrastructure |
| Latest filing | Aug 21, 2026, City of Iola |
| Sources we check | 1 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Grimes County

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Infrastructure | 29 | 64% |
| Development decisions | 6 | 13% |
| Residential | 4 | 9% |
| Industrial | 4 | 9% |
| Public and institutional | 2 | 4% |

## Recent projects in Grimes County

| Project | Location | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|---|
| 51.33-Acre Wastewater Infrastructure Project | Iola, TX | Not stated | Sewer and wastewater | 51.3 acres | Early planning | Aug 21, 2026 |
| New Wastewater Treatment Plant Construction | Iola, TX | Teal Services, LLC | Sewer and wastewater | Not stated in filing | Approved | Jul 14, 2026 |
| $524K Bridge Rail Retrofit in Grimes County | Grimes County, TX | Not stated | Bridges | Not stated in filing | Out to bid | Jul 14, 2026 |
| 2026 Natural Gas Distribution Infrastructure Safety Project | Navasota, TX | Not stated | Utilities | Not stated in filing | Approved | Jun 22, 2026 |
| $14.8B Advanced Manufacturing Campus Phase-2 | Iola, TX | TeraFab AI, LLC | Manufacturing | Not stated in filing | Early planning | Jun 12, 2026 |
| $5B Semiconductor Manufacturing Facility | Anderson, TX | Space Exploration Technologies Corp. | Manufacturing | Not stated in filing | Approved | Jun 3, 2026 |
| $1.27M SH 90 at FM 244 Intersection Turn Lane Improvements | Grimes County, TX | Not stated | Roads and highways | Not stated in filing | Out to bid | Jun 2, 2026 |
| West Main Loop Road Paving Project | Bedias, TX | Not stated | Transportation | Not stated in filing | Approved | May 19, 2026 |
| Road and Drainage Improvements on Six Streets | Bedias, TX | Not stated | Roads and highways | Not stated in filing | Approved | May 19, 2026 |
| 220-Lot Residential Subdivision | Navasota, TX | Continental Homes of Texas, L.P. | Single-family | 220 units | Seeking approval | Apr 13, 2026 |
| West Main Loop Paving Project | Bedias, TX | Not stated | Roads and highways | Not stated in filing | Out to bid | Apr 13, 2026 |
| Road and Drainage Improvements on Six Streets | Bedias, TX | Not stated | Roads and highways | Not stated in filing | Out to bid | Apr 13, 2026 |

Showing 12 of 45 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Cities in Grimes County

- Navasota, TX · 21 projects
- Bedias, TX · 10 projects
- Iola, TX · 8 projects
- Anderson, TX · 1 project
- Todd Mission, TX · Checked, no projects in 12 months

## Nearby places

- [Brazos County, TX](https://boardwalkai.com/development/texas/brazos/) · 160+ projects
- [Washington County, TX](https://boardwalkai.com/development/texas/washington/) · 110+ projects
- [Montgomery County, TX](https://boardwalkai.com/development/texas/montgomery/) · 3,300+ projects
- Madison County, TX · 19 projects
- [Waller County, TX](https://boardwalkai.com/development/texas/waller/) · 280+ projects

All places in Texas: [Texas](https://boardwalkai.com/development/texas/)

## Questions about Grimes County

### What's planned in Grimes County, TX?

Boardwalk found 45 planned projects in Grimes County, TX in the last 12 months, mostly infrastructure. The latest is on the City of Iola agenda for Aug 21, 2026.

### Where does this data come from?

Boardwalk's Grimes County projects come from public meeting records, such as City of Iola agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Grimes County's public records at least once a week; the last check was Oct 16, 2026. These counts are as of Oct 19, 2026 and refresh monthly.

### Can I get an Alert for new Grimes County projects?

Yes, a Boardwalk Alert emails you new Grimes County projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [grimes.json](https://boardwalkai.com/data/places/texas/grimes.json) · [grimes.md](https://boardwalkai.com/development/texas/grimes/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Grimes County, TX", boardwalkai.com/development/texas/grimes/, data as of Oct 19, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
