# Planned developments in Mount Pleasant, NC

Boardwalk found 43 planned projects in Mount Pleasant, NC in public filings from the last 12 months, mostly infrastructure and residential. The latest is on the Town of Mount Pleasant Board of Commissioners agenda for Sep 8, 2026.

Data as of Oct 11, 2026. Updated monthly. Page: https://boardwalkai.com/development/north-carolina/mount-pleasant/

## Mount Pleasant at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 43 |
| New in the last 30 days | 0 |
| Most common type | Infrastructure |
| Latest filing | Sep 8, 2026, Town of Mount Pleasant Board of Commissioners |
| Sources we check | 2 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Mount Pleasant

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Infrastructure | 22 | 51% |
| Residential | 9 | 21% |
| Commercial | 5 | 12% |
| Development decisions | 3 | 7% |
| Public and institutional | 2 | 5% |
| Industrial | 2 | 5% |

## Recent projects in Mount Pleasant

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| Water Treatment Plant Renovation Project | Not stated | Water treatment plants | Not stated in filing | Early planning | Sep 8, 2026 |
| Lower Adams Creek Sewer Outfall Project | Not stated | Sewer and wastewater | Not stated in filing | Early planning | Aug 11, 2026 |
| Hillside Dr. Manhole Repairs and Sewer Line Replacement | Not stated | Pipelines | Not stated in filing | In design | May 12, 2026 |
| S. Skyland Area Waterline Design Engineering Contract | Not stated | Pipelines | Not stated in filing | In design | May 12, 2026 |
| 12-Inch Waterline Construction from North Drive to Jackson Street | Not stated | Pipelines | Not stated in filing | Early planning | Apr 14, 2026 |
| $5.8M Downtown Stormwater and Utility Duct Bank Infrastructure | Not stated | Stormwater and drainage | Not stated in filing | Early planning | Mar 21, 2026 |
| $2.7M N. Washington Street Sidewalk and Turn Lane Project | Not stated | Sidewalks | Not stated in filing | Out to bid | Mar 21, 2026 |
| $1.7M Downtown Southwest Quadrant Parking and Stormwater Project | Not stated | Transportation | Not stated in filing | In design | Mar 21, 2026 |
| 700-Capacity Entertainment Venue Renovation | Mt. Pleasant Theater Inc. | Entertainment venues | Not stated in filing | In design | Mar 21, 2026 |
| $112K Downtown Southwest Quadrant Parking Improvements | Not stated | Parking lots | 3.4 acres | In design | Nov 10, 2025 |

Showing 10 of 43 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- [Concord, NC](https://boardwalkai.com/development/north-carolina/concord/) · 89 projects
- [Locust, NC](https://boardwalkai.com/development/north-carolina/locust/) · 29 projects
- Red Cross, NC · Checked, no projects in 12 months
- Misenheimer, NC · 1 project
- [Rockwell, NC](https://boardwalkai.com/development/north-carolina/rockwell/) · 45 projects
- Richfield, NC · 1 project

All places in North Carolina: [North Carolina](https://boardwalkai.com/development/north-carolina/)

## Questions about Mount Pleasant

### What's planned in Mount Pleasant, NC?

Boardwalk found 43 planned projects in Mount Pleasant, NC in the last 12 months, mostly infrastructure and residential. The latest is on the Town of Mount Pleasant Board of Commissioners agenda for Sep 8, 2026.

### Where does this data come from?

Boardwalk's Mount Pleasant projects come from public meeting records, such as Town of Mount Pleasant Board of Commissioners agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Mount Pleasant's public records at least once a week; the last check was Oct 10, 2026. These counts are as of Oct 11, 2026 and refresh monthly.

### Can I get an Alert for new Mount Pleasant projects?

Yes, a Boardwalk Alert emails you new Mount Pleasant projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [mount-pleasant.json](https://boardwalkai.com/data/places/north-carolina/mount-pleasant.json) · [mount-pleasant.md](https://boardwalkai.com/development/north-carolina/mount-pleasant/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Mount Pleasant, NC", boardwalkai.com/development/north-carolina/mount-pleasant/, data as of Oct 11, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
