# Planned developments in Lake George, NY

Boardwalk found 29 planned projects in Lake George, NY in public filings from the last 12 months, mostly infrastructure and commercial. The latest is on the Lake George Village Planning Board agenda for Aug 19, 2026.

Data as of Oct 11, 2026. Updated monthly. Page: https://boardwalkai.com/development/new-york/lake-george/

## Lake George at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 29 |
| New in the last 30 days | 0 |
| Most common type | Infrastructure |
| Latest filing | Aug 19, 2026, Lake George Village Planning Board |
| Sources we check | 22 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Lake George

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Infrastructure | 10 | 34% |
| Commercial | 8 | 28% |
| Residential | 6 | 21% |
| Development decisions | 5 | 17% |

## Recent projects in Lake George

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| 28-Room Motel Redevelopment at 51 Canada Street | Lake George View Realty | Hotels and lodging | Not stated in filing | Seeking approval | Jun 17, 2026 |
| $2,077 Water Main Engineering Services for Schermerhorn Senior Apartments | Schermerhorn Construction | Senior living | Not stated in filing | Approved | Jun 15, 2026 |
| 600-Seat Rooftop Expansion and Mall Renovation | GNSD Enterprizes | Retail | Not stated in filing | Continued | Jun 3, 2026 |
| Lake Walk, Observation Deck, Wayfinding, and Streetscape Project | Not stated | Trails and greenways | Not stated in filing | Early planning | Mar 16, 2026 |
| NYS Route 9N Lake Shore Drive Reconstruction and Bridge Replacement | Not stated | Roads and highways | Not stated in filing | Early planning | Mar 10, 2026 |
| NYS Route 9N over English Brook Bridge Replacement | Not stated | Bridges | Not stated in filing | Early planning | Mar 10, 2026 |
| 8-Unit Motel Expansion at 2905 Lakeshore Drive | Pinebrook Motel | Hotels and lodging | 8 units | Continued | Jan 7, 2026 |
| Lake Shore Drive Reconstruction and English Brook Bridge Replacement | Not stated | Roads and highways | Not stated in filing | Early planning | Oct 22, 2025 |
| $98K Wastewater Treatment Plant Clarifier Conversion Engineering | Not stated | Sewer and wastewater | Not stated in filing | Approved | Oct 20, 2025 |
| $50K Wastewater Treatment Plant Septage Facility Design | Not stated | Sewer and wastewater | Not stated in filing | Approved | Oct 20, 2025 |
| New Bank Branch with Drive-Through | Adirondack Trust Company | Banks | Not stated in filing | Seeking approval | May 21, 2025 |

Showing 11 of 29 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- [Glens Falls, NY](https://boardwalkai.com/development/new-york/glens-falls/) · 72 projects
- South Glens Falls, NY · 10 projects
- Hudson Falls, NY · 5 projects
- [Fort Edward, NY](https://boardwalkai.com/development/new-york/fort-edward/) · 27 projects
- [Corinth, NY](https://boardwalkai.com/development/new-york/corinth/) · 30 projects
- Whitehall, NY · 7 projects

All places in New York: [New York](https://boardwalkai.com/development/new-york/)

## Questions about Lake George

### What's planned in Lake George, NY?

Boardwalk found 29 planned projects in Lake George, NY in the last 12 months, mostly infrastructure and commercial. The latest is on the Lake George Village Planning Board agenda for Aug 19, 2026.

### Where does this data come from?

Boardwalk's Lake George projects come from public meeting records, such as Lake George Village Planning Board agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Lake George's public records at least once a week; the last check was Oct 11, 2026. These counts are as of Oct 11, 2026 and refresh monthly.

### Can I get an Alert for new Lake George projects?

Yes, a Boardwalk Alert emails you new Lake George projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [lake-george.json](https://boardwalkai.com/data/places/new-york/lake-george.json) · [lake-george.md](https://boardwalkai.com/development/new-york/lake-george/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Lake George, NY", boardwalkai.com/development/new-york/lake-george/, data as of Oct 11, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
