# Planned developments in Croton-on-Hudson, NY

Boardwalk found 60 planned projects in Croton-on-Hudson, NY in public filings from the last 12 months, mostly infrastructure and residential. The latest is on the Village of Croton-on-Hudson Board of Trustees agenda for Sep 30, 2026.

Data as of Oct 11, 2026. Updated monthly. Page: https://boardwalkai.com/development/new-york/croton-on-hudson/

## Croton-on-Hudson at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 60 |
| New in the last 30 days | 8 |
| Most common type | Infrastructure |
| Latest filing | Sep 30, 2026, Village of Croton-on-Hudson Board of Trustees |
| Sources we check | 5 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Croton-on-Hudson

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Infrastructure | 24 | 40% |
| Residential | 13 | 22% |
| Public and institutional | 12 | 20% |
| Development decisions | 9 | 15% |
| Commercial | 1 | 2% |
| Industrial | 1 | 2% |

## Recent projects in Croton-on-Hudson

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| Railroad Signal Infrastructure Project | Metropolitan Transportation Authority | Railroads | Not stated in filing | Early planning | Sep 30, 2026 |
| BESS 2.0 Battery Infrastructure Planning | Not stated | Utilities | Not stated in filing | Approved | Sep 20, 2026 |
| $32K Half Moon Bay Bridge Rehabilitation Engineering Contract | Not stated | Bridges | Not stated in filing | In design | Aug 19, 2026 |
| $250K Gouveia Park Community Center Renovation | Not stated | Community centers | Not stated in filing | Approved | Jul 15, 2026 |
| $750K Salt Storage Structure at Croton Point Park | Westchester County | Industrial | Not stated in filing | Approved | Jul 15, 2026 |
| Battery Energy Storage System Development Initiative | Not stated | Battery storage | Not stated in filing | Approved | Jun 28, 2026 |
| $270K Croton-Harmon Train Station Flood Mitigation Project | Not stated | Stormwater and drainage | Not stated in filing | Approved | May 20, 2026 |
| 15-Acre Gouveia Park Rehabilitation and Main House Renovation | Not stated | Parks | 15 acres | Early planning | Mar 25, 2026 |
| Harrison Street and Sunset Trail Water Main Infrastructure Project | Not stated | Pipelines | Not stated in filing | Early planning | Mar 25, 2026 |
| 52 Mt Airy Rd | 52 Mt Airy Rd, LLC | Single-family | 1 home | Referred | Mar 17, 2026 |
| 100-Unit Affordable Housing Development | WBP Development LLC | Affordable (LIHTC) housing | 100 units | Approved | Feb 18, 2026 |
| 5-Megawatt Battery Energy Storage System at Municipal Place | Not stated | Utilities | Not stated in filing | Referred | Nov 9, 2025 |

Showing 12 of 60 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- [Ossining, NY](https://boardwalkai.com/development/new-york/ossining/) · 160+ projects
- [Haverstraw, NY](https://boardwalkai.com/development/new-york/haverstraw/) · 49 projects
- Buchanan, NY · 16 projects
- [West Haverstraw, NY](https://boardwalkai.com/development/new-york/west-haverstraw/) · 44 projects
- [Stony Point, NY](https://boardwalkai.com/development/new-york/stony-point/) · 28 projects
- [Briarcliff Manor, NY](https://boardwalkai.com/development/new-york/briarcliff-manor/) · 110+ projects

All places in New York: [New York](https://boardwalkai.com/development/new-york/)

## Questions about Croton-on-Hudson

### What's planned in Croton-on-Hudson, NY?

Boardwalk found 60 planned projects in Croton-on-Hudson, NY in the last 12 months, mostly infrastructure and residential. The latest is on the Village of Croton-on-Hudson Board of Trustees agenda for Sep 30, 2026.

### Where does this data come from?

Boardwalk's Croton-on-Hudson projects come from public meeting records, such as Village of Croton-on-Hudson Board of Trustees agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Croton-on-Hudson's public records at least once a week; the last check was Oct 11, 2026. These counts are as of Oct 11, 2026 and refresh monthly.

### Can I get an Alert for new Croton-on-Hudson projects?

Yes, a Boardwalk Alert emails you new Croton-on-Hudson projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [croton-on-hudson.json](https://boardwalkai.com/data/places/new-york/croton-on-hudson.json) · [croton-on-hudson.md](https://boardwalkai.com/development/new-york/croton-on-hudson/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Croton-on-Hudson, NY", boardwalkai.com/development/new-york/croton-on-hudson/, data as of Oct 11, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
