# Planned developments in Truth or Consequences, NM

Boardwalk found 38 planned projects in Truth or Consequences, NM in public filings from the last 12 months.

Data as of Oct 11, 2026. Updated monthly. Page: https://boardwalkai.com/development/new-mexico/truth-or-consequences/

## Truth or Consequences at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 38 |
| New in the last 30 days | 11 |
| Most common type | Infrastructure |
| Latest filing | Sep 28, 2026, City of Truth or Consequences Staff |
| Sources we check | 3 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Truth or Consequences

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Infrastructure | 18 | 47% |
| Development decisions | 7 | 18% |
| Public and institutional | 5 | 13% |
| Residential | 4 | 11% |
| Commercial | 2 | 5% |
| Industrial | 1 | 3% |
| Agricultural | 1 | 3% |

## Recent projects in Truth or Consequences

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| Vac Station Repairs and 51-Pit Renovation on Hagen Street | Not stated | Utilities | Not stated in filing | In design | Sep 28, 2026 |
| Rio Grande Riverwalk Trail Development | Not stated | Trails and greenways | Not stated in filing | Early planning | Sep 28, 2026 |
| Critical Waterlines and WSPI-2 Infrastructure Project | Not stated | Pipelines | Not stated in filing | In design | Sep 28, 2026 |
| $1.8M Marie Street Infrastructure Improvements | Bartoo Sand & Gravel | Roads and highways | Not stated in filing | In design | Sep 28, 2026 |
| Police Department Renovation of Former Bank Building | Not stated | Fire and police stations | Not stated in filing | Early planning | Sep 28, 2026 |
| 1,000-Meter Smart Water Infrastructure Upgrade | Not stated | Utilities | Not stated in filing | Out to bid | Sep 28, 2026 |
| Local Government Road Fund Program Grant Agreement | Not stated | Roads and highways | Not stated in filing | Early planning | Sep 23, 2026 |
| Wastewater System Improvements Infrastructure Project | Not stated | Sewer and wastewater | Not stated in filing | Early planning | Sep 9, 2026 |
| Water System Improvements Project Design Services Application | Not stated | Utilities | Not stated in filing | Early planning | Aug 28, 2026 |
| Riverwalk Trail Development at Ralph Edwards Park | Not stated | Trails and greenways | Not stated in filing | Early planning | Aug 28, 2026 |
| Marie Street Road and Drainage Infrastructure Improvements | Not stated | Roads and highways | Not stated in filing | Early planning | Jul 22, 2026 |
| Police Department Renovation of Former Bank | Not stated | Fire and police stations | Not stated in filing | Out to bid | Mar 11, 2026 |

Showing 12 of 38 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- Williamsburg, NM · Checked, no projects in 12 months
- Elephant Butte, NM · 16 projects
- Hatch, NM · 3 projects
- Bayard, NM · 4 projects
- Santa Clara, NM · 14 projects
- Hurley, NM · 5 projects

All places in New Mexico: [New Mexico](https://boardwalkai.com/development/new-mexico/)

## Questions about Truth or Consequences

### What's planned in Truth or Consequences, NM?

Boardwalk found 38 planned projects in Truth or Consequences, NM in the last 12 months.

### Where does this data come from?

Boardwalk's Truth or Consequences projects come from public meeting records. Each one links to the original filing.

### How current is it?

Boardwalk checks Truth or Consequences's public records at least once a week; the last check was Oct 12, 2026. These counts are as of Oct 11, 2026 and refresh monthly.

### Can I get an Alert for new Truth or Consequences projects?

Yes, a Boardwalk Alert emails you new Truth or Consequences projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [truth-or-consequences.json](https://boardwalkai.com/data/places/new-mexico/truth-or-consequences.json) · [truth-or-consequences.md](https://boardwalkai.com/development/new-mexico/truth-or-consequences/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Truth or Consequences, NM", boardwalkai.com/development/new-mexico/truth-or-consequences/, data as of Oct 11, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
