# Planned developments in Roswell, NM

Boardwalk found 52 planned projects in Roswell, NM in public filings from the last 12 months, mostly infrastructure. The latest is on the Roswell Airport Advisory Commission agenda for Oct 6, 2026.

Data as of Oct 11, 2026. Updated monthly. Page: https://boardwalkai.com/development/new-mexico/roswell/

## Roswell at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 52 |
| New in the last 30 days | 3 |
| Most common type | Infrastructure |
| Latest filing | Oct 6, 2026, Roswell Airport Advisory Commission |
| Sources we check | 9 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Roswell

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Infrastructure | 30 | 58% |
| Development decisions | 7 | 13% |
| Residential | 5 | 10% |
| Public and institutional | 5 | 10% |
| Commercial | 4 | 8% |
| Industrial | 1 | 2% |

## Recent projects in Roswell

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| Terminal Emergency Generator Installation | Not stated | Transportation | Not stated in filing | Out to bid | Oct 6, 2026 |
| $20.25M CDBG-DR Infrastructure Investment Projects | Not stated | Roads and highways | Not stated in filing | Early planning | Aug 19, 2026 |
| 9.56-Acre Industrial Service Center Expansion | XCEL ENERGY | Industrial | 9.56 acres | Approved | Jul 9, 2026 |
| $1.85M Air Center Stormwater Improvements | Not stated | Stormwater and drainage | Not stated in filing | Early planning | Jul 9, 2026 |
| $50K Budget Adjustment for Roswell First Response Center Design | Not stated | Government buildings | Not stated in filing | In design | Jul 9, 2026 |
| 2.70-Megawatt Community Solar Energy Facility | Gallagher Solar LLC | Power plants | Not stated in filing | Approved | Jun 11, 2026 |
| Museum Taxiway and Gate Infrastructure Update | Not stated | Transportation | Not stated in filing | In design | Jun 2, 2026 |
| $1.07M Flood Repair Design Professional Services | Not stated | Bridges | Not stated in filing | Approved | Apr 20, 2026 |
| $3.3M Road Maintenance Project Applications | Not stated | Roads and highways | Not stated in filing | Early planning | Apr 9, 2026 |
| $150K Fire Station #2 Architectural and Engineering Design | Not stated | Fire and police stations | Not stated in filing | In design | Mar 12, 2026 |
| 6,000-Foot Emergency Landing Strip at Brown Brothers Ranch | Brown Brothers Ranch | Transportation | 8.26 acres | Early planning | Feb 10, 2026 |
| 9.37-Acre Manufactured Home and RV Park Development | KS&G Corporation | Manufactured homes | 9.37 acres | Seeking approval | Feb 3, 2026 |

Showing 12 of 52 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- Hagerman, NM · 5 projects
- Artesia, NM · 12 projects
- Capitan, NM · 4 projects
- Ruidoso Downs, NM · 28 projects
- [Ruidoso, NM](https://boardwalkai.com/development/new-mexico/ruidoso/) · 37 projects
- [Carlsbad, NM](https://boardwalkai.com/development/new-mexico/carlsbad/) · 83 projects

All places in New Mexico: [New Mexico](https://boardwalkai.com/development/new-mexico/)

## Questions about Roswell

### What's planned in Roswell, NM?

Boardwalk found 52 planned projects in Roswell, NM in the last 12 months, mostly infrastructure. The latest is on the Roswell Airport Advisory Commission agenda for Oct 6, 2026.

### Where does this data come from?

Boardwalk's Roswell projects come from public meeting records, such as Roswell Airport Advisory Commission agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Roswell's public records at least once a week; the last check was Oct 11, 2026. These counts are as of Oct 11, 2026 and refresh monthly.

### Can I get an Alert for new Roswell projects?

Yes, a Boardwalk Alert emails you new Roswell projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [roswell.json](https://boardwalkai.com/data/places/new-mexico/roswell.json) · [roswell.md](https://boardwalkai.com/development/new-mexico/roswell/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Roswell, NM", boardwalkai.com/development/new-mexico/roswell/, data as of Oct 11, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
