# Planned developments in Las Vegas, NM

Boardwalk found 39 planned projects in Las Vegas, NM in public filings from the last 12 months, mostly residential and infrastructure. The latest is on the Las Vegas Design Review Board agenda for Sep 28, 2026.

Data as of Oct 11, 2026. Updated monthly. Page: https://boardwalkai.com/development/new-mexico/las-vegas/

## Las Vegas at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 39 |
| New in the last 30 days | 4 |
| Most common type | Residential |
| Latest filing | Sep 28, 2026, Las Vegas Design Review Board |
| Sources we check | 3 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Las Vegas

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Residential | 13 | 33% |
| Infrastructure | 10 | 26% |
| Development decisions | 9 | 23% |
| Public and institutional | 4 | 10% |
| Commercial | 3 | 8% |

## Recent projects in Las Vegas

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| Waste Water Treatment Plant Funding Acceptance | Not stated | Water treatment plants | Not stated in filing | Recommended | Oct 1, 2026 |
| 8th Street Waterline Extension Infrastructure Project | Not stated | Pipelines | Not stated in filing | Recommended | Oct 1, 2026 |
| Plaza Park Improvements and Electrical Upgrades | Not stated | Parks | Not stated in filing | In design | Sep 28, 2026 |
| Commerce Street Construction Grant Acceptance | Not stated | Roads and highways | Not stated in filing | Recommended | Sep 3, 2026 |
| Runway and Taxiway Pavement Maintenance | Not stated | Airports | Not stated in filing | Out to bid | Aug 7, 2026 |
| Water Storage Tank Infrastructure on Airport Property | Not stated | Utilities | Not stated in filing | Early planning | Jul 14, 2026 |
| Water Treatment Plant Facility Planning and Design | HDR Engineering Inc. | Water treatment plants | Not stated in filing | In design | Jul 2, 2026 |
| Waste Water Planning and Engineering Services Addendum | Not stated | Utilities | Not stated in filing | Recommended | Jul 2, 2026 |
| $2.3M Douglas Avenue and Safeway Parking Lot Improvement Project | Charlie's Spic & Span | Roads and highways | Not stated in filing | Approved | Feb 6, 2026 |
| 7,500-Sqft Gas Maintenance Shop | Not stated | Utilities | Not stated in filing | Out to bid | Dec 12, 2025 |
| 13-Unit Townhome Development | Not stated | Townhomes | 13 townhomes | Approved | Nov 24, 2025 |

Showing 11 of 39 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- San Miguel, NM · 2 projects
- [Pecos, NM](https://boardwalkai.com/development/new-mexico/pecos/) · 250+ projects
- [Santa Fe, NM](https://boardwalkai.com/development/new-mexico/santa-fe-city/) · 290+ projects
- Wagon Mound, NM · 14 projects
- [Agua Fria, NM](https://boardwalkai.com/development/new-mexico/agua-fria/) · 37 projects
- La Mesilla, NM · 5 projects

All places in New Mexico: [New Mexico](https://boardwalkai.com/development/new-mexico/)

## Questions about Las Vegas

### What's planned in Las Vegas, NM?

Boardwalk found 39 planned projects in Las Vegas, NM in the last 12 months, mostly residential and infrastructure. The latest is on the Las Vegas Design Review Board agenda for Sep 28, 2026.

### Where does this data come from?

Boardwalk's Las Vegas projects come from public meeting records, such as Las Vegas Design Review Board agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Las Vegas's public records at least once a week; the last check was Oct 10, 2026. These counts are as of Oct 11, 2026 and refresh monthly.

### Can I get an Alert for new Las Vegas projects?

Yes, a Boardwalk Alert emails you new Las Vegas projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [las-vegas.json](https://boardwalkai.com/data/places/new-mexico/las-vegas.json) · [las-vegas.md](https://boardwalkai.com/development/new-mexico/las-vegas/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Las Vegas, NM", boardwalkai.com/development/new-mexico/las-vegas/, data as of Oct 11, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
