# Planned developments in Bay Head, NJ

Boardwalk found 32 planned projects in Bay Head, NJ in public filings from the last 12 months, mostly infrastructure and residential. The latest is on the Bay Head Planning Board agenda for Sep 16, 2026.

Data as of Oct 11, 2026. Updated monthly. Page: https://boardwalkai.com/development/new-jersey/bay-head/

## Bay Head at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 32 |
| New in the last 30 days | 1 |
| Most common type | Infrastructure |
| Latest filing | Sep 16, 2026, Bay Head Planning Board |
| Sources we check | 22 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Bay Head

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Infrastructure | 13 | 41% |
| Residential | 9 | 28% |
| Development decisions | 7 | 22% |
| Public and institutional | 2 | 6% |
| Commercial | 1 | 3% |

## Recent projects in Bay Head

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| Bay Head School Site Plan Review | Not stated | Schools | Not stated in filing | Seeking approval | Sep 16, 2026 |
| Route 46 Intersection and Safety Improvements | Not stated | Roads and highways | Not stated in filing | Early planning | Jul 14, 2026 |
| Route 35 Safety Improvement Project | Not stated | Roads and highways | Not stated in filing | Early planning | Jul 13, 2026 |
| Schalks Crossing Road Bridge Replacement | Not stated | Bridges | Not stated in filing | In design | Jul 13, 2026 |
| Route 54 Bridge Replacement over Penny Pot Stream | Not stated | Bridges | Not stated in filing | Early planning | Jul 7, 2026 |
| Route 29 Resurfacing and Intersection Upgrades | Not stated | Roads and highways | Not stated in filing | In design | Jun 29, 2026 |
| 11-Mile I-287 Pavement Rehabilitation | Not stated | Roads and highways | Not stated in filing | Early planning | Jun 16, 2026 |
| Flood Barrier Design for Eight Locations | Not stated | Utilities | Not stated in filing | In design | Jan 7, 2026 |
| Pump Station Design and Analysis for Scow Ditch Area | Not stated | Utilities | Not stated in filing | In design | Jan 7, 2026 |
| Scow Ditch Flood Control Engineering Project | Not stated | Utilities | Not stated in filing | In design | Dec 9, 2025 |
| Howe Park Improvement Project Bid Rejection | Not stated | Parks | Not stated in filing | Out to bid | Sep 15, 2025 |
| Bulkhead Flood Barrier Construction Project | Not stated | Utilities | Not stated in filing | In design | Aug 12, 2025 |

Showing 12 of 32 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- [Point Pleasant Beach, NJ](https://boardwalkai.com/development/new-jersey/point-pleasant-beach/) · 25 projects
- [Point Pleasant, NJ](https://boardwalkai.com/development/new-jersey/point-pleasant/) · 36 projects
- Mantoloking, NJ · 6 projects
- [Brielle, NJ](https://boardwalkai.com/development/new-jersey/brielle/) · 56 projects
- [Manasquan, NJ](https://boardwalkai.com/development/new-jersey/manasquan/) · 44 projects
- Sea Girt, NJ · 3 projects

All places in New Jersey: [New Jersey](https://boardwalkai.com/development/new-jersey/)

## Questions about Bay Head

### What's planned in Bay Head, NJ?

Boardwalk found 32 planned projects in Bay Head, NJ in the last 12 months, mostly infrastructure and residential. The latest is on the Bay Head Planning Board agenda for Sep 16, 2026.

### Where does this data come from?

Boardwalk's Bay Head projects come from public meeting records, such as Bay Head Planning Board agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Bay Head's public records at least once a week; the last check was Oct 11, 2026. These counts are as of Oct 11, 2026 and refresh monthly.

### Can I get an Alert for new Bay Head projects?

Yes, a Boardwalk Alert emails you new Bay Head projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [bay-head.json](https://boardwalkai.com/data/places/new-jersey/bay-head.json) · [bay-head.md](https://boardwalkai.com/development/new-jersey/bay-head/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Bay Head, NJ", boardwalkai.com/development/new-jersey/bay-head/, data as of Oct 11, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
