# Planned developments in Silver Bay, MN

Boardwalk found 28 planned projects in Silver Bay, MN in public filings from the last 12 months, mostly infrastructure. The latest is on the Public Utilities Commission agenda for Aug 24, 2026.

Data as of Oct 11, 2026. Updated monthly. Page: https://boardwalkai.com/development/minnesota/silver-bay/

## Silver Bay at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 28 |
| New in the last 30 days | 0 |
| Most common type | Infrastructure |
| Latest filing | Aug 24, 2026, Public Utilities Commission |
| Sources we check | 19 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Silver Bay

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Infrastructure | 18 | 64% |
| Public and institutional | 4 | 14% |
| Residential | 3 | 11% |
| Development decisions | 2 | 7% |
| Commercial | 1 | 4% |

## Recent projects in Silver Bay

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| $315K Phase 2 Citywide Street and Utility Improvement Project | Not stated | Roads and highways | Not stated in filing | Recommended | Aug 24, 2026 |
| 2026 Citywide Street and Utility Improvements | Not stated | Roads and highways | Not stated in filing | Approved | Apr 23, 2026 |
| Workforce Housing Development | Vision Inc | Multifamily | Not stated in filing | Early planning | Apr 20, 2026 |
| Watermain Replacement Infrastructure Funding Application | Not stated | Pipelines | Not stated in filing | Early planning | Mar 16, 2026 |
| 2026 Citywide Street & Utility Improvement Project | Not stated | Roads and highways | Not stated in filing | Out to bid | Mar 16, 2026 |
| Solar Photovoltaic System Interconnection | Not stated | Utilities | Not stated in filing | Approved | Mar 16, 2026 |
| Watermain Replacement Funding Application | Not stated | Pipelines | Not stated in filing | Approved | Mar 16, 2026 |
| Street and Utility Reconstruction on Adams Blvd. and Arthur Circle | Not stated | Roads and highways | Not stated in filing | In design | Mar 9, 2026 |
| Water Systems Improvements Project | Magney Construction | Water treatment plants | Not stated in filing | Recommended | Jan 22, 2026 |
| Trailhead Center DNR Grant Application Preparation | Not stated | Parks | Not stated in filing | Approved | Jan 20, 2026 |
| Phase 1A Citywide Street and Utility Improvement Project | Not stated | Roads and highways | Not stated in filing | Approved | Jan 20, 2026 |
| $1M Perimeter Ditching Water Diversion Project | Not stated | Stormwater and drainage | Not stated in filing | Early planning | Nov 3, 2025 |

Showing 12 of 28 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- Beaver Bay, MN · 3 projects
- [Two Harbors, MN](https://boardwalkai.com/development/minnesota/two-harbors/) · 38 projects
- Babbitt, MN · 5 projects
- Hoyt Lakes, MN · 6 projects
- [Rice Lake (Clearwater County), MN](https://boardwalkai.com/development/minnesota/rice-lake-clearwater/) · 34 projects
- [Rice Lake (St. Louis County), MN](https://boardwalkai.com/development/minnesota/rice-lake/) · 110+ projects

All places in Minnesota: [Minnesota](https://boardwalkai.com/development/minnesota/)

## Questions about Silver Bay

### What's planned in Silver Bay, MN?

Boardwalk found 28 planned projects in Silver Bay, MN in the last 12 months, mostly infrastructure. The latest is on the Public Utilities Commission agenda for Aug 24, 2026.

### Where does this data come from?

Boardwalk's Silver Bay projects come from public meeting records, such as Public Utilities Commission agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Silver Bay's public records at least once a week; the last check was Oct 12, 2026. These counts are as of Oct 11, 2026 and refresh monthly.

### Can I get an Alert for new Silver Bay projects?

Yes, a Boardwalk Alert emails you new Silver Bay projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [silver-bay.json](https://boardwalkai.com/data/places/minnesota/silver-bay.json) · [silver-bay.md](https://boardwalkai.com/development/minnesota/silver-bay/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Silver Bay, MN", boardwalkai.com/development/minnesota/silver-bay/, data as of Oct 11, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
