# Planned developments in Port Deposit, MD

Boardwalk found 29 planned projects in Port Deposit, MD in public filings from the last 12 months, mostly infrastructure.

Data as of Oct 11, 2026. Updated monthly. Page: https://boardwalkai.com/development/maryland/port-deposit/

## Port Deposit at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 29 |
| New in the last 30 days | 0 |
| Most common type | Infrastructure |
| Latest filing | Aug 18, 2026, Town of Port Deposit Staff |
| Sources we check | 1 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Port Deposit

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Infrastructure | 18 | 62% |
| Industrial | 3 | 10% |
| Development decisions | 3 | 10% |
| Public and institutional | 3 | 10% |
| Commercial | 1 | 3% |
| Agricultural | 1 | 3% |

## Recent projects in Port Deposit

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| Tome Steps Phase 1 Infrastructure Project | Not stated | Transportation | Not stated in filing | Early planning | Aug 18, 2026 |
| Town-Owned Parking Lot Improvements at Three Main Street Sites | Not stated | Parking lots | Not stated in filing | In design | Aug 18, 2026 |
| 34.7-Acre Business and Industrial District Annexation | Bainbridge Development Corporation | Industrial | 34.7 acres | Approved | Aug 18, 2026 |
| Rock Run Embankment Stabilization | Not stated | Bridges | 0.04 acres | Out to bid | Jun 8, 2026 |
| Industrial Development with 55-Foot Building | MRP Industrial | Industrial | Not stated in filing | Approved | Apr 23, 2026 |
| 370,000-Gallon Wastewater Treatment Plant Expansion | KCl Technologies | Sewer and wastewater | Not stated in filing | Approved | Apr 23, 2026 |
| $750K Marina Park Revitalization | Not stated | Parks | Not stated in filing | In design | Feb 28, 2026 |
| Solar Field on Capped Landfill | Not stated | Utilities | Not stated in filing | Early planning | Dec 2, 2025 |
| Powers Road Extension and Diamond Jim Road Modifications | Bainbridge Development Corporation | Roads and highways | Not stated in filing | Seeking approval | Nov 20, 2025 |
| Powers Road Extension Infrastructure Project | Not stated | Roads and highways | Not stated in filing | Seeking approval | Nov 4, 2025 |
| 105-Stall Waterfront Marina Park with Boat Ramp and Boardwalk | Not stated | Parks | Not stated in filing | In design | Oct 20, 2025 |
| 2.5 MW Solar PV System on 55 Acres | Bainbridge Development Corporation | Utilities | 742 acres | Seeking approval | May 22, 2025 |

Showing 12 of 29 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- [Perryville, MD](https://boardwalkai.com/development/maryland/perryville/) · 62 projects
- Havre de Grace, MD · 2 projects
- Rising Sun, MD · 4 projects
- [Aberdeen, MD](https://boardwalkai.com/development/maryland/aberdeen/) · 43 projects
- Charlestown, MD · 30 projects
- [North East, MD](https://boardwalkai.com/development/maryland/north-east/) · 25 projects

All places in Maryland: [Maryland](https://boardwalkai.com/development/maryland/)

## Questions about Port Deposit

### What's planned in Port Deposit, MD?

Boardwalk found 29 planned projects in Port Deposit, MD in the last 12 months, mostly infrastructure.

### Where does this data come from?

Boardwalk's Port Deposit projects come from public meeting records. Each one links to the original filing.

### How current is it?

Boardwalk checks Port Deposit's public records at least once a week; the last check was Oct 10, 2026. These counts are as of Oct 11, 2026 and refresh monthly.

### Can I get an Alert for new Port Deposit projects?

Yes, a Boardwalk Alert emails you new Port Deposit projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [port-deposit.json](https://boardwalkai.com/data/places/maryland/port-deposit.json) · [port-deposit.md](https://boardwalkai.com/development/maryland/port-deposit/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Port Deposit, MD", boardwalkai.com/development/maryland/port-deposit/, data as of Oct 11, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
