# Planned developments in Cambridge, MD

Boardwalk found 91 planned projects in Cambridge, MD in public filings from the last 12 months. The latest is on the City of Cambridge Planning Commission agenda for Sep 1, 2026.

Data as of Oct 11, 2026. Updated monthly. Page: https://boardwalkai.com/development/maryland/cambridge/

## Cambridge at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 91 |
| New in the last 30 days | 6 |
| Most common type | Govt. Decisions |
| Latest filing | Sep 1, 2026, City of Cambridge Planning Commission |
| Sources we check | 3 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Cambridge

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Development decisions | 44 | 48% |
| Residential | 24 | 26% |
| Infrastructure | 19 | 21% |
| Commercial | 2 | 2% |
| Public and institutional | 1 | 1% |
| Industrial | 1 | 1% |

## Recent projects in Cambridge

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| Flood Mitigation Infrastructure for the West End | Not stated | Stormwater and drainage | Not stated in filing | In design | Aug 31, 2026 |
| Safe Streets and Roads for All Transportation Infrastructure Grant | Not stated | Roads and highways | Not stated in filing | Out to bid | Jul 16, 2026 |
| Cedar Street Flood Mitigation and Roadway Improvements | Not stated | Roads and highways | Not stated in filing | In design | Jul 16, 2026 |
| 12-Unit Residential Subdivision on Camper Street | Habitat for Humanity Choptank, Inc. | Single-family | 12 homes | Recommended | Jul 7, 2026 |
| $6.86M Trenton Street Sewage Pumping Station Rehabilitation | Not stated | Sewer and wastewater | Not stated in filing | In design | Jun 8, 2026 |
| 7.75-MW Solar Generating Station Complex | Pivot Energy Development LLC. | Solar farms | Not stated in filing | Recommended | May 5, 2026 |
| Solar Energy System at 2237 Hudson Road | Pivot Energy Development LLC | Utilities | Not stated in filing | Seeking approval | May 5, 2026 |
| 2.0 MW Solar Energy System at 2237 Hudson Road | Pivot Energy Development LLC | Utilities | Not stated in filing | Seeking approval | Apr 7, 2026 |
| $5.25M Infrastructure Funding Request for Three City Projects | Not stated | Sewer and wastewater | Not stated in filing | Approved | Mar 2, 2026 |
| 34-Unit Workforce Housing Development | Green Street Housing, LLC | Multifamily | 34 units | Seeking approval | Jan 21, 2026 |
| Industrial Site Development at 822 Chesapeake Drive | Floriat LLC | Industrial | Not stated in filing | Seeking approval | Jan 6, 2026 |

Showing 11 of 91 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- Church Creek, MD · Checked, no projects in 12 months
- Trappe, MD · 13 projects
- Secretary, MD · Checked, no projects in 12 months
- Oxford, MD · 57 projects
- Hurlock, MD · 3 projects
- Preston, MD · Checked, no projects in 12 months

All places in Maryland: [Maryland](https://boardwalkai.com/development/maryland/)

## Questions about Cambridge

### What's planned in Cambridge, MD?

Boardwalk found 91 planned projects in Cambridge, MD in the last 12 months. The latest is on the City of Cambridge Planning Commission agenda for Sep 1, 2026.

### Where does this data come from?

Boardwalk's Cambridge projects come from public meeting records, such as City of Cambridge Planning Commission agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Cambridge's public records at least once a week; the last check was Oct 12, 2026. These counts are as of Oct 11, 2026 and refresh monthly.

### Can I get an Alert for new Cambridge projects?

Yes, a Boardwalk Alert emails you new Cambridge projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [cambridge.json](https://boardwalkai.com/data/places/maryland/cambridge.json) · [cambridge.md](https://boardwalkai.com/development/maryland/cambridge/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Cambridge, MD", boardwalkai.com/development/maryland/cambridge/, data as of Oct 11, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
