# Planned developments in Grimes, IA

Boardwalk found 50 planned projects in Grimes, IA in public filings from the last 12 months. The latest is on the Grimes Parks and Recreation Advisory Board agenda for Sep 23, 2026.

Data as of Oct 11, 2026. Updated monthly. Page: https://boardwalkai.com/development/iowa/grimes/

## Grimes at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 50 |
| New in the last 30 days | 3 |
| Most common type | Infrastructure |
| Latest filing | Sep 23, 2026, Grimes Parks and Recreation Advisory Board |
| Sources we check | 4 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Grimes

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Infrastructure | 24 | 48% |
| Development decisions | 13 | 26% |
| Residential | 4 | 8% |
| Commercial | 3 | 6% |
| Industrial | 3 | 6% |
| Public and institutional | 3 | 6% |

## Recent projects in Grimes

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| SE 37th Street West Gap Improvements | HR Green, Inc. | Roads and highways | Not stated in filing | In design | Sep 22, 2026 |
| Waterworks Park Phase II Development | Not stated | Parks | Not stated in filing | Early planning | Sep 9, 2026 |
| NW Beaverbrooke Blvd Functional Design | JEO Consulting Group | Transportation | Not stated in filing | In design | Aug 25, 2026 |
| $13K NE Gateway Dr. Lane Extension | Not stated | Transportation | Not stated in filing | In design | Aug 25, 2026 |
| 2026 CIPP Lining Project Sewer Infrastructure Maintenance | Not stated | Utilities | Not stated in filing | Out to bid | Aug 25, 2026 |
| S James Street Roadway Improvements | Not stated | Roads and highways | Not stated in filing | In design | Aug 25, 2026 |
| NE Beaverbrooke Blvd & NE Gateway Drive Roundabout Design Contract | Not stated | Transportation | Not stated in filing | In design | Jul 28, 2026 |
| Meadows Park Project REAP Grant Application | Not stated | Parks | Not stated in filing | Early planning | Jul 28, 2026 |
| Phase 1B Water Main Improvements | McClure Engineering Company | Pipelines | Not stated in filing | In design | Apr 14, 2026 |
| County Line Road Widening Project | Not stated | Roads and highways | Not stated in filing | In design | Jan 13, 2026 |
| SW 19th Street SRF Pond Infrastructure Improvements | Not stated | Utilities | Not stated in filing | In design | Nov 10, 2025 |

Showing 11 of 50 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- [Urbandale, IA](https://boardwalkai.com/development/iowa/urbandale/) · 250+ projects
- [Johnston, IA](https://boardwalkai.com/development/iowa/johnston/) · 240+ projects
- Granger, IA · Checked, no projects in 12 months
- [Clive, IA](https://boardwalkai.com/development/iowa/clive/) · 29 projects
- [Waukee, IA](https://boardwalkai.com/development/iowa/waukee/) · 300+ projects
- Polk City, IA · 17 projects

All places in Iowa: [Iowa](https://boardwalkai.com/development/iowa/)

## Questions about Grimes

### What's planned in Grimes, IA?

Boardwalk found 50 planned projects in Grimes, IA in the last 12 months. The latest is on the Grimes Parks and Recreation Advisory Board agenda for Sep 23, 2026.

### Where does this data come from?

Boardwalk's Grimes projects come from public meeting records, such as Grimes Parks and Recreation Advisory Board agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Grimes's public records at least once a week; the last check was Oct 12, 2026. These counts are as of Oct 11, 2026 and refresh monthly.

### Can I get an Alert for new Grimes projects?

Yes, a Boardwalk Alert emails you new Grimes projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [grimes.json](https://boardwalkai.com/data/places/iowa/grimes.json) · [grimes.md](https://boardwalkai.com/development/iowa/grimes/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Grimes, IA", boardwalkai.com/development/iowa/grimes/, data as of Oct 11, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
