# Planned developments in The Villages, FL

Boardwalk found 110+ planned projects in The Villages, FL in public filings from the last 12 months. The latest is on the Architectural Review Committee agenda for Oct 7, 2026.

Data as of Oct 11, 2026. Updated monthly. Page: https://boardwalkai.com/development/florida/the-villages/

## The Villages at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 110+ |
| New in the last 30 days | 13 |
| Most common type | Govt. Decisions |
| Latest filing | Oct 7, 2026, Architectural Review Committee |
| Sources we check | 3 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in The Villages

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Development decisions | 79 | 67% |
| Infrastructure | 18 | 15% |
| Residential | 17 | 14% |
| Commercial | 2 | 2% |
| Public and institutional | 2 | 2% |

## Recent projects in The Villages

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| Basin D12-10 Berm Construction Project | Not stated | Utilities | Not stated in filing | Early planning | Sep 30, 2026 |
| Tunnel M18 Wall Remediation Design Project | Not stated | Transportation | Not stated in filing | In design | Sep 1, 2026 |
| Tunnel M18 Remediation Project Engineering and Design Services | Not stated | Utilities | Not stated in filing | In design | Sep 1, 2026 |
| Central Parkway Widening Stormwater Pond Acquisition | 470 Land, LLC | Roads and highways | Not stated in filing | Early planning | Jun 9, 2026 |
| US 301 and C 466 Intersection Design Services | Infrastructure Consulting and Engineering | Roads and highways | Not stated in filing | In design | Mar 24, 2026 |
| C 466A Corridor Intersection Improvements | Not stated | Roads and highways | Not stated in filing | In design | Mar 24, 2026 |
| Warm Springs Ave and Fenney Way Roundabout Improvements | Not stated | Transportation | Not stated in filing | Early planning | Mar 17, 2026 |
| Religious Facility Development | Sts. Joachim and Anna Orthodox Church Inc. | Places of worship | Not stated in filing | Seeking approval | Feb 16, 2026 |
| Candlebrook Force Main Replacement Engineering | Ardurra Group | Pipelines | Not stated in filing | In design | Nov 12, 2025 |

Showing 9 of 110+ projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- [Wildwood, FL](https://boardwalkai.com/development/florida/wildwood/) · 130+ projects
- [Lady Lake, FL](https://boardwalkai.com/development/florida/lady-lake/) · 100+ projects
- [Fruitland Park, FL](https://boardwalkai.com/development/florida/fruitland-park/) · 36 projects
- [Belleview, FL](https://boardwalkai.com/development/florida/belleview/) · 31 projects
- [Leesburg, FL](https://boardwalkai.com/development/florida/leesburg/) · 150+ projects
- [Tavares, FL](https://boardwalkai.com/development/florida/tavares/) · 21 projects

All places in Florida: [Florida](https://boardwalkai.com/development/florida/)

## Questions about The Villages

### What's planned in The Villages, FL?

Boardwalk found 110+ planned projects in The Villages, FL in the last 12 months. The latest is on the Architectural Review Committee agenda for Oct 7, 2026.

### Where does this data come from?

Boardwalk's The Villages projects come from public meeting records, such as Architectural Review Committee agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks The Villages's public records at least once a week; the last check was Oct 12, 2026. These counts are as of Oct 11, 2026 and refresh monthly.

### Can I get an Alert for new The Villages projects?

Yes, a Boardwalk Alert emails you new The Villages projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [the-villages.json](https://boardwalkai.com/data/places/florida/the-villages.json) · [the-villages.md](https://boardwalkai.com/development/florida/the-villages/index.md)

## How to cite

Source: Boardwalk, "Planned developments in The Villages, FL", boardwalkai.com/development/florida/the-villages/, data as of Oct 11, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
