# Planned developments in Madison County, FL

Boardwalk found 43 planned projects in Madison County, FL in public filings from the last 12 months, mostly infrastructure. The latest is on the Town of Lee Town Board agenda for Sep 8, 2026.

Data as of Oct 19, 2026. Updated monthly. Page: https://boardwalkai.com/development/florida/madison/

## Madison County at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 43 |
| New in the last 30 days | 0 |
| Most common type | Infrastructure |
| Latest filing | Sep 8, 2026, Town of Lee Town Board |
| Sources we check | 1 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Madison County

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Infrastructure | 22 | 51% |
| Development decisions | 11 | 26% |
| Public and institutional | 5 | 12% |
| Commercial | 3 | 7% |
| Residential | 1 | 2% |
| Industrial | 1 | 2% |

## Recent projects in Madison County

| Project | Location | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|---|
| Waterline Replacement Project | Greenville, FL | Not stated | Pipelines | Not stated in filing | In design | Jun 15, 2026 |
| Flooding Mitigation Project | Greenville, FL | Suwannee River Water Management District | Utilities | Not stated in filing | In design | Jun 15, 2026 |
| Streun Road Culvert Installation Project | Lee, FL | Not stated | Roads and highways | Not stated in filing | Out to bid | Jun 9, 2026 |
| 2-Pump Replacement at Greenville Water Treatment Plant | Greenville, FL | Not stated | Water treatment plants | Not stated in filing | Out to bid | Jun 1, 2026 |
| Water Filtration System Upgrade at Greenville Water Plant | Greenville, FL | Not stated | Water treatment plants | Not stated in filing | Out to bid | Jun 1, 2026 |
| $15M Water Infrastructure Improvement Project for Districts 1 & 2 | Lee, FL | Not stated | Pipelines | Not stated in filing | In design | May 26, 2026 |
| Septic to Sewer Conversion at US 90 and SR 221 North | Greenville, FL | Not stated | Sewer and wastewater | Not stated in filing | Out to bid | May 18, 2026 |
| Water Filtration Facility Infrastructure Upgrade | Greenville, FL | Not stated | Utilities | Not stated in filing | Out to bid | May 18, 2026 |
| Streun Road and Point Rock Road Culvert Infrastructure Project | Lee, FL | Not stated | Stormwater and drainage | Not stated in filing | Approved | May 12, 2026 |
| Four Freedoms Dialysis Center Renovation | Greenville, FL | DaVita | Office | Not stated in filing | Approved | Apr 13, 2026 |
| Commercial Structure Expansion | Town of Lee, FL | Bartell Machinery Systems L.L.C. | Commercial | Not stated in filing | Approved | Mar 17, 2026 |
| Industrial Expansion for Bartell Machinery Systems | Lee, FL | Pike Construction | Industrial | Not stated in filing | Approved | Mar 3, 2026 |

Showing 12 of 43 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Cities in Madison County

- [Lee, FL](https://boardwalkai.com/development/florida/lee-city/) · 24 projects
- Greenville, FL · 17 projects
- Madison, FL · 2 projects

## Nearby places

- Jefferson County, FL · 15 projects
- [Taylor County, FL](https://boardwalkai.com/development/florida/taylor/) · 74 projects
- [Hamilton County, FL](https://boardwalkai.com/development/florida/hamilton/) · 43 projects
- [Suwannee County, FL](https://boardwalkai.com/development/florida/suwannee/) · 69 projects
- Lafayette County, FL · 19 projects
- [Leon County, FL](https://boardwalkai.com/development/florida/leon/) · 170+ projects

All places in Florida: [Florida](https://boardwalkai.com/development/florida/)

## Questions about Madison County

### What's planned in Madison County, FL?

Boardwalk found 43 planned projects in Madison County, FL in the last 12 months, mostly infrastructure. The latest is on the Town of Lee Town Board agenda for Sep 8, 2026.

### Where does this data come from?

Boardwalk's Madison County projects come from public meeting records, such as Town of Lee Town Board agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Madison County's public records at least once a week; the last check was Oct 18, 2026. These counts are as of Oct 19, 2026 and refresh monthly.

### Can I get an Alert for new Madison County projects?

Yes, a Boardwalk Alert emails you new Madison County projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [madison.json](https://boardwalkai.com/data/places/florida/madison.json) · [madison.md](https://boardwalkai.com/development/florida/madison/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Madison County, FL", boardwalkai.com/development/florida/madison/, data as of Oct 19, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
