# Planned developments in Winsted, CT

Boardwalk found 110+ planned projects in Winsted, CT in public filings from the last 12 months, mostly infrastructure and residential. The latest is on the Town of Winchester Planning and Zoning Commission agenda for Sep 28, 2026.

Data as of Oct 11, 2026. Updated monthly. Page: https://boardwalkai.com/development/connecticut/winsted/

## Winsted at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 110+ |
| New in the last 30 days | 11 |
| Most common type | Govt. Decisions |
| Latest filing | Sep 28, 2026, Town of Winchester Planning and Zoning Commission |
| Sources we check | 5 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Winsted

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Development decisions | 35 | 32% |
| Infrastructure | 28 | 25% |
| Residential | 27 | 25% |
| Commercial | 10 | 9% |
| Public and institutional | 9 | 8% |
| Industrial | 1 | 1% |

## Recent projects in Winsted

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| South Road Reclamation and Drainage Improvements | Not stated | Roads and highways | Not stated in filing | Early planning | Sep 17, 2026 |
| Affordable Housing Special Permit Modification | Winsted Health Center, Inc. | Residential | Not stated in filing | Seeking approval | Aug 24, 2026 |
| $612,500 Newfield Road Bridge Local Bridge Program Grant | Not stated | Transportation | Not stated in filing | Approved | Aug 17, 2026 |
| Lead Service Line Replacement Phase 2 Infrastructure Project | Not stated | Pipelines | Not stated in filing | Early planning | Aug 11, 2026 |
| $3.27M Holabird Avenue Drainage and Repaving Project | Not stated | Roads and highways | Not stated in filing | Out to bid | Aug 3, 2026 |
| Barkhamsted Water Line Installation | Not stated | Pipelines | Not stated in filing | Early planning | Jul 14, 2026 |
| PRV Design Infrastructure Project | Yield Construction | Utilities | Not stated in filing | In design | Jul 14, 2026 |
| Landscaping and Construction Yard Site Plan | Yield Properties | Industrial | Not stated in filing | Seeking approval | Jun 8, 2026 |
| Self-Storage Facility Rezoning | Winchester Self Storage | Self-storage | Not stated in filing | Seeking approval | May 19, 2026 |
| 30-Unit Residential Conversion of Former Nursing Home | Lake Street Development, LLC | Multifamily | 30 units | Seeking approval | Mar 23, 2026 |
| $630K Sue Grossman Trail Sewer Extension | Not stated | Sewer and wastewater | Not stated in filing | Early planning | Mar 10, 2026 |
| 4-Unit Residential Expansion at Batcheller School Apartments | Batcheller School Apartments | Multifamily | 4 units | Seeking approval | Jan 28, 2026 |

Showing 12 of 110+ projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- [Norfolk, CT](https://boardwalkai.com/development/connecticut/norfolk/) · 44 projects
- [Torrington, CT](https://boardwalkai.com/development/connecticut/torrington/) · 130+ projects
- [Litchfield, CT](https://boardwalkai.com/development/connecticut/litchfield/) · 170+ projects
- Cornwall, CT · 25 projects
- Bantam, CT · 13 projects
- [Thomaston, CT](https://boardwalkai.com/development/connecticut/thomaston/) · 44 projects

All places in Connecticut: [Connecticut](https://boardwalkai.com/development/connecticut/)

## Questions about Winsted

### What's planned in Winsted, CT?

Boardwalk found 110+ planned projects in Winsted, CT in the last 12 months, mostly infrastructure and residential. The latest is on the Town of Winchester Planning and Zoning Commission agenda for Sep 28, 2026.

### Where does this data come from?

Boardwalk's Winsted projects come from public meeting records, such as Town of Winchester Planning and Zoning Commission agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Winsted's public records at least once a week; the last check was Oct 12, 2026. These counts are as of Oct 11, 2026 and refresh monthly.

### Can I get an Alert for new Winsted projects?

Yes, a Boardwalk Alert emails you new Winsted projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [winsted.json](https://boardwalkai.com/data/places/connecticut/winsted.json) · [winsted.md](https://boardwalkai.com/development/connecticut/winsted/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Winsted, CT", boardwalkai.com/development/connecticut/winsted/, data as of Oct 11, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
