# Planned developments in Waterford, CT

Boardwalk found 85 planned projects in Waterford, CT in public filings from the last 12 months. The latest is on the Waterford Utility Commission agenda for Sep 29, 2026.

Data as of Oct 11, 2026. Updated monthly. Page: https://boardwalkai.com/development/connecticut/waterford/

## Waterford at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 85 |
| New in the last 30 days | 4 |
| Most common type | Institutional/Public |
| Latest filing | Sep 29, 2026, Waterford Utility Commission |
| Sources we check | 1 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Waterford

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Public and institutional | 22 | 26% |
| Infrastructure | 21 | 25% |
| Residential | 18 | 21% |
| Development decisions | 15 | 18% |
| Commercial | 8 | 9% |
| Industrial | 1 | 1% |

## Recent projects in Waterford

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| Contract 1 Phase 2 Sewer Easement Access Clearing | Not stated | Sewer and wastewater | Not stated in filing | In design | Sep 29, 2026 |
| $167K Bartlett Corners Booster Station Decommissioning | Not stated | Utilities | Not stated in filing | Continued | Sep 2, 2026 |
| 760-Square-Foot Drive-Thru Coffee Shop | Drive ThruBrewWaterford LLC | Quick-service and drive-thru | Not stated in filing | Recommended | Aug 25, 2026 |
| Phase III Soil Investigation and Management Plan | Not stated | Fire and police stations | Not stated in filing | In design | Aug 6, 2026 |
| Oswegatchie Fire Station Change Order Process Review | Not stated | Fire and police stations | Not stated in filing | Seeking approval | Jul 16, 2026 |
| Restaurant Depot Retail Development | WS Asset Management | Retail | Not stated in filing | Approved | Apr 7, 2026 |
| Auto Repair and Service Center at 17 Industrial Drive | Elite Auto Services | Auto repair | Not stated in filing | Seeking approval | Apr 7, 2026 |
| Stenger Kingfisher Bridge Project Infrastructure Improvements | Not stated | Bridges | Not stated in filing | Out to bid | Mar 24, 2026 |
| 1,000-Tree Adaptive Reuse of Crystal Mall | Electric Boat Corporation | Office buildings | Not stated in filing | Recommended | Mar 10, 2026 |
| 3,720-Sqft Synagogue on 2.58 Acres | Congregation Beth-El, Inc. of New London | Places of worship | 2.58 acres | Approved | Feb 12, 2026 |
| $756K-$1.05M Route 85 Wastewater Pumping Station Power Upgrade | Electric Boat | Utilities | Not stated in filing | Early planning | Feb 10, 2026 |
| Leary Park Drainage and Lower Park Access Infrastructure Project | Not stated | Parks | Not stated in filing | Early planning | Feb 10, 2026 |

Showing 12 of 85 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- [New London, CT](https://boardwalkai.com/development/connecticut/new-london/) · 32 projects
- [Groton, CT](https://boardwalkai.com/development/connecticut/groton/) · 52 projects
- [Fenwick, CT](https://boardwalkai.com/development/connecticut/fenwick/) · 28 projects
- [Stonington, CT](https://boardwalkai.com/development/connecticut/stonington/) · 65 projects
- [Norwich, CT](https://boardwalkai.com/development/connecticut/norwich/) · 190+ projects
- Colchester, CT · 3 projects

All places in Connecticut: [Connecticut](https://boardwalkai.com/development/connecticut/)

## Questions about Waterford

### What's planned in Waterford, CT?

Boardwalk found 85 planned projects in Waterford, CT in the last 12 months. The latest is on the Waterford Utility Commission agenda for Sep 29, 2026.

### Where does this data come from?

Boardwalk's Waterford projects come from public meeting records, such as Waterford Utility Commission agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Waterford's public records at least once a week; the last check was Oct 11, 2026. These counts are as of Oct 11, 2026 and refresh monthly.

### Can I get an Alert for new Waterford projects?

Yes, a Boardwalk Alert emails you new Waterford projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [waterford.json](https://boardwalkai.com/data/places/connecticut/waterford.json) · [waterford.md](https://boardwalkai.com/development/connecticut/waterford/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Waterford, CT", boardwalkai.com/development/connecticut/waterford/, data as of Oct 11, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
