# Planned developments in Coalinga, CA

Boardwalk found 25 planned projects in Coalinga, CA in public filings from the last 12 months, mostly infrastructure. The latest is on the Coalinga City Council agenda for Oct 1, 2026.

Data as of Oct 11, 2026. Updated monthly. Page: https://boardwalkai.com/development/california/coalinga/

## Coalinga at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 25 |
| New in the last 30 days | 5 |
| Most common type | Infrastructure |
| Latest filing | Oct 1, 2026, Coalinga City Council |
| Sources we check | 6 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Coalinga

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Infrastructure | 19 | 76% |
| Residential | 2 | 8% |
| Development decisions | 2 | 8% |
| Public and institutional | 2 | 8% |

## Recent projects in Coalinga

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| Natural Gas Valve Replacement Project Engineering Services | Not stated | Utilities | Not stated in filing | In design | Oct 1, 2026 |
| Natural Gas Valve Replacement Project Engineering Task Orders | Not stated | Utilities | Not stated in filing | In design | Oct 1, 2026 |
| Sewer Collection System and WWTP Improvements Project | Not stated | Sewer and wastewater | Not stated in filing | Early planning | Sep 3, 2026 |
| Automated Weather Observation System Replacement at Coalinga Airport | Not stated | Airports | Not stated in filing | In design | Jul 16, 2026 |
| New Coalinga Municipal Airport Design Engineering | Not stated | Airports | Not stated in filing | In design | Jul 16, 2026 |
| Federal Aviation Administration Grant Agreements for Airport Projects | Not stated | Airports | Not stated in filing | Early planning | Jun 17, 2026 |
| Resurfacing Phase 3 Project Design Engineering Contract | Not stated | Roads and highways | Not stated in filing | In design | Jan 8, 2026 |
| Coalinga Multi-Trail System Design Engineering for Segments 7, 8, 9c | Not stated | Trails and greenways | Not stated in filing | In design | Jan 8, 2026 |
| Safe Route to School Safety Improvements Project | Not stated | Transportation | Not stated in filing | Early planning | Oct 16, 2025 |
| N Garfield Street Water Main Replacement Engineering | Not stated | Pipelines | Not stated in filing | In design | Oct 16, 2025 |

Showing 10 of 25 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- Huron, CA · 1 project
- Avenal, CA · 3 projects
- [Stratford, CA](https://boardwalkai.com/development/california/stratford/) · 820+ projects
- San Joaquin, CA · 4 projects
- [Lemoore, CA](https://boardwalkai.com/development/california/lemoore/) · 36 projects
- Paso Robles, CA · 180+ projects

All places in California: [California](https://boardwalkai.com/development/california/)

## Questions about Coalinga

### What's planned in Coalinga, CA?

Boardwalk found 25 planned projects in Coalinga, CA in the last 12 months, mostly infrastructure. The latest is on the Coalinga City Council agenda for Oct 1, 2026.

### Where does this data come from?

Boardwalk's Coalinga projects come from public meeting records, such as Coalinga City Council agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Coalinga's public records at least once a week; the last check was Oct 12, 2026. These counts are as of Oct 11, 2026 and refresh monthly.

### Can I get an Alert for new Coalinga projects?

Yes, a Boardwalk Alert emails you new Coalinga projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [coalinga.json](https://boardwalkai.com/data/places/california/coalinga.json) · [coalinga.md](https://boardwalkai.com/development/california/coalinga/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Coalinga, CA", boardwalkai.com/development/california/coalinga/, data as of Oct 11, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
