# Planned developments in Lake Havasu City, AZ

Boardwalk found 49 planned projects in Lake Havasu City, AZ in public filings from the last 12 months, mostly residential and infrastructure. The latest is on the Lake Havasu City Parks and Recreation Advisory Board agenda for Sep 28, 2026.

Data as of Oct 11, 2026. Updated monthly. Page: https://boardwalkai.com/development/arizona/lake-havasu-city/

## Lake Havasu City at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 49 |
| New in the last 30 days | 2 |
| Most common type | Residential |
| Latest filing | Sep 28, 2026, Lake Havasu City Parks and Recreation Advisory Board |
| Sources we check | 3 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Lake Havasu City

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Residential | 18 | 37% |
| Infrastructure | 13 | 27% |
| Commercial | 6 | 12% |
| Public and institutional | 5 | 10% |
| Development decisions | 5 | 10% |
| Mixed use | 1 | 2% |
| Industrial | 1 | 2% |

## Recent projects in Lake Havasu City

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| Kiowa Drain #6 Wash Stabilization Project | Not stated | Utilities | Not stated in filing | In design | Jul 14, 2026 |
| Terminal Apron Pavement Reconstruction Project Design Grant | Not stated | Airports | Not stated in filing | In design | Jun 23, 2026 |
| Runway Safety Area Improvements Construction Management | Not stated | Airports | Not stated in filing | In design | May 12, 2026 |
| $35.5M Second Bridge & Roadway Improvement Project | Not stated | Bridges | Not stated in filing | In design | Apr 14, 2026 |
| North Area Hangar Development Project Design and Bidding Services | Not stated | Airports | Not stated in filing | Approved | Feb 24, 2026 |
| North End Hangar Construction and Air Service Opportunities | Not stated | Airports | Not stated in filing | Early planning | Jan 22, 2026 |
| Second Bridge Design Overview | Not stated | Bridges | Not stated in filing | In design | Jan 22, 2026 |
| 90.5-Acre Mixed-Use Resort and Marina Development | Island Land Venture, LLC | Homes and businesses | 90.5 acres | Seeking approval | Jan 13, 2026 |
| Aquatic Center Outdoor Pool Pre-Construction Services | Concord General Contracting | Pools | Not stated in filing | Out to bid | Nov 25, 2025 |
| Pima Wash #8 Stabilization Project Design Services | Not stated | Utilities | Not stated in filing | In design | Nov 25, 2025 |

Showing 10 of 49 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- Parker, AZ · 19 projects
- [Bullhead City, AZ](https://boardwalkai.com/development/arizona/bullhead-city/) · 54 projects
- Kingman, AZ · 13 projects
- Quartzsite, AZ · 13 projects
- Salome, AZ · 3 projects
- Sunwest, AZ · 12 projects

All places in Arizona: [Arizona](https://boardwalkai.com/development/arizona/)

## Questions about Lake Havasu City

### What's planned in Lake Havasu City, AZ?

Boardwalk found 49 planned projects in Lake Havasu City, AZ in the last 12 months, mostly residential and infrastructure. The latest is on the Lake Havasu City Parks and Recreation Advisory Board agenda for Sep 28, 2026.

### Where does this data come from?

Boardwalk's Lake Havasu City projects come from public meeting records, such as Lake Havasu City Parks and Recreation Advisory Board agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Lake Havasu City's public records at least once a week; the last check was Oct 10, 2026. These counts are as of Oct 11, 2026 and refresh monthly.

### Can I get an Alert for new Lake Havasu City projects?

Yes, a Boardwalk Alert emails you new Lake Havasu City projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [lake-havasu-city.json](https://boardwalkai.com/data/places/arizona/lake-havasu-city.json) · [lake-havasu-city.md](https://boardwalkai.com/development/arizona/lake-havasu-city/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Lake Havasu City, AZ", boardwalkai.com/development/arizona/lake-havasu-city/, data as of Oct 11, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
