# Planned developments in Gilbert, AZ

Boardwalk found 46 planned projects in Gilbert, AZ in public filings from the last 12 months, mostly infrastructure and residential. The latest is on the Town of Gilbert Industrial Development Authority agenda for Sep 22, 2026.

Data as of Oct 11, 2026. Updated monthly. Page: https://boardwalkai.com/development/arizona/gilbert/

## Gilbert at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 46 |
| New in the last 30 days | 9 |
| Most common type | Infrastructure |
| Latest filing | Sep 22, 2026, Town of Gilbert Industrial Development Authority |
| Sources we check | 23 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Gilbert

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Infrastructure | 16 | 35% |
| Residential | 13 | 28% |
| Commercial | 9 | 20% |
| Public and institutional | 4 | 9% |
| Industrial | 3 | 7% |
| Mixed use | 1 | 2% |

## Recent projects in Gilbert

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| Pecos Road Reconstruction and Traffic Signal Installation | Not stated | Roads and highways | Not stated in filing | Out to bid | Sep 15, 2026 |
| 3-Mile Multi-Use Trail Extension | Not stated | Trails and greenways | Not stated in filing | Out to bid | Sep 15, 2026 |
| $18.4M Pecos Road Reconstruction and Signal Project | Not stated | Roads and highways | Not stated in filing | Out to bid | Sep 15, 2026 |
| $458K Wastewater System Fiber Optic Connectivity Project | Not stated | Sewer and wastewater | Not stated in filing | In design | Sep 15, 2026 |
| $222K Charbray Reclaimed Water Line Engineering Contract | Not stated | Utilities | Not stated in filing | In design | Sep 1, 2026 |
| Higley Road Improvements and Signal Upgrades | Not stated | Roads and highways | Not stated in filing | In design | Sep 1, 2026 |
| 12,000-Linear-Foot Reclaimed Water Pipeline | Not stated | Pipelines | Not stated in filing | In design | Aug 18, 2026 |
| $659K Somerton Blvd Roadway Improvements | Entellus, Inc. | Roads and highways | Not stated in filing | In design | Aug 11, 2026 |
| McQueen and Guadalupe Intersection Improvements | Not stated | Roads and highways | Not stated in filing | Early planning | Aug 11, 2026 |
| $357K Pioneer Street Utility Improvements | NFRA Inc. | Utilities | Not stated in filing | In design | Aug 11, 2026 |
| 171,558-Square-Foot Retail Center on 27.7 Acres | Barclay Group | Stores and shopping centers | 27.7 acres | Approved | May 6, 2026 |
| 10-Home Residential Subdivision on 3.63 Acres | Woodside Homes | Single-family | 10 homes · 3.63 acres | Approved | Dec 3, 2025 |

Showing 12 of 46 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- [Chandler, AZ](https://boardwalkai.com/development/arizona/chandler/) · 100+ projects
- [Mesa, AZ](https://boardwalkai.com/development/arizona/mesa/) · 150+ projects
- Tempe, AZ · 3 projects
- Guadalupe, AZ · 42 projects
- [Queen Creek, AZ](https://boardwalkai.com/development/arizona/queen-creek/) · 76 projects
- [Scottsdale, AZ](https://boardwalkai.com/development/arizona/scottsdale/) · 73 projects

All places in Arizona: [Arizona](https://boardwalkai.com/development/arizona/)

## Questions about Gilbert

### What's planned in Gilbert, AZ?

Boardwalk found 46 planned projects in Gilbert, AZ in the last 12 months, mostly infrastructure and residential. The latest is on the Town of Gilbert Industrial Development Authority agenda for Sep 22, 2026.

### Where does this data come from?

Boardwalk's Gilbert projects come from public meeting records, such as Town of Gilbert Industrial Development Authority agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Gilbert's public records at least once a week; the last check was Oct 12, 2026. These counts are as of Oct 11, 2026 and refresh monthly.

### Can I get an Alert for new Gilbert projects?

Yes, a Boardwalk Alert emails you new Gilbert projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [gilbert.json](https://boardwalkai.com/data/places/arizona/gilbert.json) · [gilbert.md](https://boardwalkai.com/development/arizona/gilbert/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Gilbert, AZ", boardwalkai.com/development/arizona/gilbert/, data as of Oct 11, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
