# Planned developments in Camp Verde, AZ

Boardwalk found 55 planned projects in Camp Verde, AZ in public filings from the last 12 months, mostly infrastructure. The latest is on the Town of Camp Verde agenda for Sep 29, 2026.

Data as of Oct 19, 2026. Updated monthly. Page: https://boardwalkai.com/development/arizona/camp-verde/

## Camp Verde at a glance

| Measure | Value |
|---|---|
| Projects, last 12 months | 55 |
| New in the last 30 days | 14 |
| Most common type | Infrastructure |
| Latest filing | Sep 29, 2026, Town of Camp Verde |
| Sources we check | 3 |

Last 12 months, duplicates merged. Includes private, public, and small jobs. How we count: https://boardwalkai.com/coverage/#how-we-count

## What's planned in Camp Verde

By type, last 12 months.

| Type | Projects | Share |
|---|---|---|
| Infrastructure | 30 | 55% |
| Public and institutional | 13 | 24% |
| Development decisions | 5 | 9% |
| Residential | 4 | 7% |
| Commercial | 3 | 5% |

## Recent projects in Camp Verde

| Project | Developer | Type | Size | Stage | Latest meeting |
|---|---|---|---|---|---|
| New High View Production Wells Infrastructure Project | Not stated | Utilities | Not stated in filing | Early planning | Sep 29, 2026 |
| Water Main Annual Replacement | Not stated | Pipelines | Not stated in filing | Early planning | Sep 29, 2026 |
| Sewer Line Infrastructure Construction in Black Bridge Loop Area | Not stated | Sewer and wastewater | Not stated in filing | Early planning | Sep 29, 2026 |
| Annual Sewer Main Expansion Infrastructure Project | Not stated | Pipelines | Not stated in filing | Early planning | Sep 29, 2026 |
| Treatment Plant Administrative Building Capital Improvement | Not stated | Water treatment plants | Not stated in filing | Early planning | Sep 29, 2026 |
| WWTP Control Panels Upgrade | Not stated | Utilities | Not stated in filing | Early planning | Sep 29, 2026 |
| Northbound Sewer Collection System Infrastructure Upgrade | Not stated | Sewer and wastewater | Not stated in filing | Early planning | Sep 29, 2026 |
| Blower Addition Building and Installation for Wastewater Fund | Not stated | Utilities | Not stated in filing | Early planning | Sep 29, 2026 |
| $7.7M Montezuma Castle Highway Improvements | Not stated | Roads and highways | Not stated in filing | Early planning | Apr 22, 2026 |
| $3M Sports Complex Phase II Development | Not stated | Parks | Not stated in filing | Early planning | Apr 22, 2026 |
| 80-Unit Workforce Housing Development | Woda Cooper Development, Inc. | Multifamily | 80 units | Denied | Apr 1, 2026 |
| $2M Water Storage Facility and Pump Station | Verde Commercial Developer | Water tanks and reservoirs | 0.9 acres | Recommended | Jun 4, 2025 |

Showing 12 of 55 projects. A free trial opens the full records and documents.

Samples show projects filed by companies or public bodies.

## Nearby places

- [Cottonwood (Apache County), AZ](https://boardwalkai.com/development/arizona/cottonwood/) · 100+ projects
- [Cottonwood (Yavapai County), AZ](https://boardwalkai.com/development/arizona/cottonwood-yavapai/) · 40 projects
- [Clarkdale, AZ](https://boardwalkai.com/development/arizona/clarkdale/) · 23 projects
- [Jerome, AZ](https://boardwalkai.com/development/arizona/jerome/) · 73 projects
- Sedona, AZ · 24 projects
- Dewey-Humboldt, AZ · Checked, no projects in 12 months

All places in Arizona: [Arizona](https://boardwalkai.com/development/arizona/)

## Questions about Camp Verde

### What's planned in Camp Verde, AZ?

Boardwalk found 55 planned projects in Camp Verde, AZ in the last 12 months, mostly infrastructure. The latest is on the Town of Camp Verde agenda for Sep 29, 2026.

### Where does this data come from?

Boardwalk's Camp Verde projects come from public meeting records, such as Town of Camp Verde agendas and minutes. Each one links to the original filing.

### How current is it?

Boardwalk checks Camp Verde's public records at least once a week; the last check was Oct 17, 2026. These counts are as of Oct 19, 2026 and refresh monthly.

### Can I get an Alert for new Camp Verde projects?

Yes, a Boardwalk Alert emails you new Camp Verde projects daily, weekly, or monthly. Start with a 7-day free trial, no credit card needed.

## Get the full data

- **Count for free.** Connect Boardwalk to Claude or ChatGPT and ask how many projects match. Counting is free during your trial and on every plan. [Use it in Claude or ChatGPT](https://boardwalkai.com/mcp/)
- **Open the records.** Start a 7-day free trial, no credit card. It includes 50 project records. [Start free trial](https://boardwalkai.com/auth/signup/)
- **Use it in your tools.** CSV export, the API, and the MCP server come with every plan. [API docs](https://boardwalkai.com/docs/api/)
- **Download these numbers.** [camp-verde.json](https://boardwalkai.com/data/places/arizona/camp-verde.json) · [camp-verde.md](https://boardwalkai.com/development/arizona/camp-verde/index.md)

## How to cite

Source: Boardwalk, "Planned developments in Camp Verde, AZ", boardwalkai.com/development/arizona/camp-verde/, data as of Oct 19, 2026.

How we count: https://boardwalkai.com/coverage/#how-we-count
